Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3711550 |
|---|---|
| Organisation Name | Roads And Buildings Department |
| Tender Brief | Request For Proposal For Empanelment Of Architectural Design, Dpr And Project Management Consultant For Providing Technical Consulting Services For Various Infrastructure Projects Under Valsad Road And Building Division Valsad. |
| Last Date For Submission | 23rd Mar, 2026 |
| Opening Date | Refer to Documents |
| Document Cost | 900.00 |
|---|---|
| EMD | 50000.00 |
| Estimated Cost | 0.00 |
| City | Valsad |
|---|---|
| State | Gujarat |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Geotechnical investigation - Mobilization of equipment machinery at site and demobilization after completion of job. Taking SBC by drilling bore hole of 100 to 150 mm dia for taking sample of undisturbed/disturbed soil for required for soil investigation (Without Rock ), performing standard penetration test at 1.5 mt interval, performing various Lab test like triaxial test, direct shear test, liquid limit, plastic limit, plasticity index, grainsize analysis in Lab. Including preparation of soil reports with SBC recommendation. | 1.000 | Rmt |
| 2 | Preparing Estimates for the New Construction or Reconstruction of any building (Excluding Structural and architectural design) making all necessary Rate analysis, taking market rates if required etc. complete as per instruction of Engineer in charge and scrutinizing estimate from sanction authority and get technicalsanction. | 1.000 | Percantage ofEstimate amount(TSAmount) |
| 3 | Providing consultancy Services for Planning & design for Landscaping (inside & outside buildings), horticulture etc. and provide DPR of the same project. | 1.000 | Percantage ofEstimate amount(TSAmount) |
| 4 | Geotechnical investigation - Mobilization of equipment machinery at site and demobilization after completion of job. Taking SBC by drilling bore hole of 100 to 150 mm dia for taking sample of undisturbed/disturbed soil for required for soil investigation (Without Rock ), performing standard penetration test at 1.5 mt interval, performing various Lab test like triaxial test, direct shear test, liquid limit, plastic limit, plasticity index, grainsize analysis in Lab. Including preparation of soil reports with SBC recommendation. | 1.000 | Rmt |
| 5 | Preparing Estimates for the New Construction or Reconstruction of any building (Excluding Structural and architectural design) making all necessary Rate analysis, taking market rates if required etc. complete as per instruction of Engineer in charge and scrutinizing estimate from sanction authority and get technicalsanction. | 1.000 | Percantage ofEstimate amount(TSAmount) |
9 Days Left