| Tender ID | 3756423 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Janpad Varanasi Me Kuwar Se Kathiraon Marg Ke Chaudikaran Awam Sudridhikaran Ka Karya (6.53 Km) |
| Last Date For Submission | 24th Mar, 2026 |
| Opening Date | 24 Mar, 2026 |
| Document Cost | 5590.00 |
|---|---|
| EMD | 1906000.00 |
| Estimated Cost | 0.00 |
| City | Varanasi |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in soil for making trenches for widening of road using hydraulic excavator C.K. 90 and tipper with disposal upto 1000 m :- Excavation for road work in soil with hydraulic excavator of 0.90 cum bucket capacity including cutting and loading tipper triming bottom and side slop in accordance with requirement of lime, grade and cross section and transporting of the embankment loctiong within all lift and lead. as per MoRTH specification No. 301.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 8648.60 | Cum |
| 2 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 8648.60 | Cum |
| 3 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.With Cartage 2.0 KM (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 3426.70 | Cum |
| 4 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.Grad-1(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 4714.30 | Cum |
| 5 | Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) | 3136.40 | Cum |