Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 2422225 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Provision Of Runway Resurfacing And Allied Works At Ins Parundu Ramnad |
| Last Date For Submission | 16th Mar, 2026 |
| Opening Date | 23 Mar, 2026 |
| Document Cost | 3000.00 |
|---|---|
| EMD | 1500000.00 |
| Estimated Cost | 580000000.00 |
| City | Visakhapatnam |
|---|---|
| State | Andhra Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | ROADS | ||
| 2 | Rolling and consolidating formation surfaces in cutting with power roller exc 8 tonne and n exc 12 tonne complete all as specifed and as directed. | 2216.50 | 10 Sq. M |
| 3 | M&L Laying and compacting 200 mm thick (compacted thickness) Granular Sub Base Course (GSB) grading as per Grade II as specified Table 900-1 of MoRTH specifications for Road and Bridge works, 2013, in a single layer over compacted subgrade with natural sand, crushed gravel, crushed stone, crushed slag or combination there of as per the grading required, the materials are mechanically mixed, spread and leveling on the subgrade by using motor grader of adequate capacity, and rolling with vibratory roller of capacity 80-100 KN static weight for achieving required compaction density of atleast 98% of the Maximum Dry Density, Consolidating to required gradient and camber complete all as specified and directed with finished surface tolerances as per Table 900-1 of MoRTH specifications for Road and Bridge works, 2013. | 2216.50 | 10 Sq. M |
| 4 | M&L WBM 200 mm thick compacted thickness using granite trap or basalt in two layers each layer 75 mm thick compacted thickness with coarse aggregate of grading 2 (63 mm to 40 mm size) or of grading 3 ( 50 to 20 mm size) spread rolled and consolidated to required gradient and camber complete all as specifed and as directed. | 1107.00 | 10 Sq. M |
| 5 | M&L preparing water bound macadam surface by brushing with wire brush for removing caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc., complete all as specified and directed. | 1107.00 | 10 Sq. M |