| Tender ID | 4444497 |
|---|---|
| Organisation Name | Urban Development Department |
| Tender Brief | Laying Of Paver Block At Shiv Hanuman Mandir And Kali Mandir Premises At Jamalpur In Ward No. 03 Under Annual Maintenance Contract |
| Last Date For Submission | 6th Jun, 2026 |
| Opening Date | 08 Jun, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 22500.00 |
| Estimated Cost | 1119315.00 |
| City | Adityapur |
|---|---|
| State | Jharkhand |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) ..do .do ..specification and direction of E/I.5.1.1 + 5.1.2 | 144.22 | Per M3 |
| 2 | Disposal of excavated earth in borrow area of 2 lead 1km(k) +2km(p) (Add 50% extra for loose volume) | 216.33 | Per M3 |
| 3 | Construction of embankment with approved material obtained from borrow pits with all its lifts leads and transporting to site spreading,grading to required slope and compacting to meet requirement of Table 300-2( For Road) | 255.55 | Per M3 |
| 4 | Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of 3 joints except at sharp curve shall not to more than 5mm), Including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). (dsr 16.69) | 3.85 | Per M3 |
| 5 | Providing course clean sand in filling in foundation tranches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building a specification and direction of E/I.[5.1.10] | 72.12 | Per M3 |