Tendering Authority: Agartala Municipal Corporation
Tender ID4247307
Organisation NameAgartala Municipal Corporation
Tender BriefConstruction Of Retaining Wall And Vision Barrier At Opposite Bank Of Dashami Ghat, Phase I
Last Date For Submission18th May, 2026
Opening Date18 May, 2026
Cost
Document Cost8000.00
EMD776222.00
Estimated Cost38811099.00
Location
CityAgartala
StateTripura

Register to see full details

BOQ Items
#ItemQtyUnits
1Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.1450.000Sqm
2Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m. -All kinds of soil1450.000Sqm
3Excavation of Structures:- Earthwork in excavation for structures as per drawings and MoRT&H technical specifications clause 304 incluidng setting out, construction of shoring & bracing, removal of stumps & other deleterious materials and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated sutiable material including cost of dewatering. ( By Mechannical means) Note : The excacvated earth if found suitable can be used partly for backfilling in trenches and partly for road work. Hence cost of disposal has not been added except for marshy soil. (for depth upto 3m)1088.080Cum
4Excavation of Structures:- Earthwork in excavation for structures as per drawings and MoRT&H technical specifications clause 304 incluidng setting out, construction of shoring & bracing, removal of stumps & other deleterious materials and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated sutiable material . ( By Mechannical means) i)Cost of dewatering 1086.050Cum
5Excavation of Structures:- Earthwork in excavation for structures as per drawings and MoRT&H technical specifications clause 304 incluidng setting out, construction of shoring & bracing, removal of stumps & other deleterious materials and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated sutiable material. ( By Mechannical means) ii)The cost of shoring & shuttering1086.050Cum