Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4247307 |
|---|---|
| Organisation Name | Agartala Municipal Corporation |
| Tender Brief | Construction Of Retaining Wall And Vision Barrier At Opposite Bank Of Dashami Ghat, Phase I |
| Last Date For Submission | 18th May, 2026 |
| Opening Date | 18 May, 2026 |
| Document Cost | 8000.00 |
|---|---|
| EMD | 776222.00 |
| Estimated Cost | 38811099.00 |
| City | Agartala |
|---|---|
| State | Tripura |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 1450.000 | Sqm |
| 2 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m. -All kinds of soil | 1450.000 | Sqm |
| 3 | Excavation of Structures:- Earthwork in excavation for structures as per drawings and MoRT&H technical specifications clause 304 incluidng setting out, construction of shoring & bracing, removal of stumps & other deleterious materials and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated sutiable material including cost of dewatering. ( By Mechannical means) Note : The excacvated earth if found suitable can be used partly for backfilling in trenches and partly for road work. Hence cost of disposal has not been added except for marshy soil. (for depth upto 3m) | 1088.080 | Cum |
| 4 | Excavation of Structures:- Earthwork in excavation for structures as per drawings and MoRT&H technical specifications clause 304 incluidng setting out, construction of shoring & bracing, removal of stumps & other deleterious materials and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated sutiable material . ( By Mechannical means) i)Cost of dewatering | 1086.050 | Cum |
| 5 | Excavation of Structures:- Earthwork in excavation for structures as per drawings and MoRT&H technical specifications clause 304 incluidng setting out, construction of shoring & bracing, removal of stumps & other deleterious materials and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated sutiable material. ( By Mechannical means) ii)The cost of shoring & shuttering | 1086.050 | Cum |
6 Days Left