Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Tripura Housing And Construction Board
Tender ID3996035
Organisation NameTripura Housing And Construction Board
Tender BriefConstruction Of Vertical Extension Of Second Floor Of State B Ed College Iase At Kunjaban Agartala Tripura West Sh Building Portion For Lift Installation
Last Date For Submission20th Apr, 2026
Opening Date20 Apr, 2026
Cost
Document Cost1000.00
EMD45214.00
Estimated Cost2260674.00
Location
CityAgartala
StateTripura

Register to see full details

BOQ Items
#ItemQtyUnits
1S.H.: EARTH WORK Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.25.00Cum
2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. -All kinds of soil59.06Cum
3Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil6.65Cum
4Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. -All kinds of soil41.40Cum
5Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete.2.30Cum
20th Apr, 2026

6 Days Left