Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4525216 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Provn Of Tiling Wk In Building No T-70, T-319 And T-427 In Zone N At Mil Stn Agartala |
| Last Date For Submission | 3rd Jul, 2026 |
| Opening Date | 06 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 18480.00 |
| Estimated Cost | 924000.00 |
| City | Agartala |
|---|---|
| State | Tripura |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Roughening surfaces of old concrete floor by picking, sweeping clean and washing down with water to remove dust, etc. complete all as specified. | 410.20 | Sqm |
| 2 | Material & Labour for non skid ceramic coloured tiles 7 to 8 mm thick (square/rectangular) area of each tile exceeding 0.18 sqm but not exceeding 0.38 sqm in floors etc. set & jointed in neat cement slurry & pointed in white or coloured cement to match over 15 mm thick screed bed or bedding layer of mortar in CM 1:6 for laying floor tiles complete all as specified. | 312.00 | Sqm |
| 3 | Material & Labour for non skid ceramic coloured tiles 7 to 8 mm thick (square/rectangular) area of each tile exceeding 0.18 sqm but not exceeding 0.38 sqm as in skirting etc. set & jointed in neat cement slurry & pointed in white or coloured cement to match including 10 mm thick cement plaster in CM 1:4 complete all as specified. | 18.20 | Sqm |
| 4 | M&L for non skid ceramic coloured tiles 7 to 8 mm thick (square/rectangular) area of each tile exceeding 0.09 sqm but not exceeding 0.11 sqm in flooring etc. set & jointed in neat cement slurry & pointed in white or coloured cement to match over 15 mm thick screed bed or bedding layer of mortar in CM 1:6 for laying floor tiles complete all as specified. | 80.00 | Sqm |
| 5 | NOTES :- 1. The amount of schedule of credit shall be deducted from the total of this BOQ for arriving at contract sum. 2. Unless otherwise specified the rates for PCC shall deemed to include the cost of formwork shuttering etc, required for complete and proper execution of the work. Refer Schedule 'A' notes for details. |
6 Days Left