Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3695540 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair Replacement And Flushing Of Borewell At Various Pump Houses At Mil Stn Agartala |
| Last Date For Submission | 9th Apr, 2026 |
| Opening Date | 11 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 18000.00 |
| Estimated Cost | 900000.00 |
| City | Agartala |
|---|---|
| State | Tripura |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Flushing of existing / old bore well by air compressor with air line pipe ,complete all as specified and directed. Note : 1. Any tools & plants required to complete the job shall be include the rate of quoted . | 81.00 | hours |
| 2 | Lifting of column pipes of 100mm dia with submersible pump and motor of any capacity after disconnecting it from column pipes, submersible cable, decoupling motor & pump and disconnecting from the delivery line & reassembling the same including testing, lowering & commissioning submersible pump & motor after Re -development of borewell complete all as specified and directed. | 9.00 | Each Job |
| 3 | Dismantling of unserviceable /worn out/ broken steel rope , supply and fixing of steel wire rope 8 mm dia for guard and tied / binned with submersible motor and pump set complete all as specified and directed. | 35.00 | RM |
| 4 | Supply & fixing column pipe made of galvanized iron pipe, medium grade, 100 mm bore, 3 metre long, both side galvanised 10 mm thick flange duly screwed and welded with GI column pipe and consisting one number ISI marked rubber packing, four numbers 15 mm dia 100 mm long nuts, bolts and washer complete in all respect and all as specified and directed | 8.00 | Each |
| 5 | Dismantling of air compressor reciprocating type ,single stage ,two cylinder of working pressure of 9 kg /sqcm or 12 kg/sqcm complete with 3 HP electric driven motor ,carrying out repairs by replacing worn out /damaged spare parts ,overhauling ,providing minor parts such as bolts ,nuts & washers etc ,assembling ,testing and commissioning complete all as specified and directed . Note : Make of the spare parts shall be as per existing make / brand of equipment . | 5.00 | Each Job |
6 Days Left