Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID3727827
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Repair Replacement And Maint Of Lt Distribution Lines, Unserviceable Poles, Service Cables And Allied Works In Mes Installations At Mil Stn Agartala
Last Date For Submission11th Apr, 2026
Opening Date13 Apr, 2026
Cost
Document Cost500.00
EMD18000.00
Estimated Cost900000.00
Location
CityAgartala
StateTripura

Register to see full details

BOQ Items
#ItemQtyUnits
1Supply and fixing pin type insulator 100 mm height, 65 mm dia 1100 volts grade made of porcelain vitreous (white/brown) with one galvanised mild steel spindle two galvanised iron washer and one GI nut over LT pole all as specified and directed. .5.00Each
2Supply and fixing shackle type insulators 75 mm height, 90 mm dia, 1100 volt grade made of porcelain vitreous (White) with one galvanised mild steel trips of 31 mm width 3.00 mm thick, not less 15 cm long, fixing 12 mm dia nuts & bolts over the LT pole all as specified and directed.7.00Each
3Material & Labour for loop type insulator, made of porcelain vitreous (White) small size with over all dimension 65 x 90 mm, clearance of hole 16 mm including properly tying within the stay strand all as specified and directed.4.00Each
4Dismantling of broken, cracked, unserviceable LT pin/shackle insulator and loop insulator of any make and any size complete all as directed at site.16.00Each
5Supply and fixing steel tubular swaged pole as per IS 2713 (Part 1 to 3) - 1980, type 410 SP-31 (09 mtr long ) complete with cast iron base plate final taper plug, pole cap, bolts/nuts, screws/washes, painting with two coats of black bituminous paint through out internally and externally upto planting depth and two coasts of black and white alternate strips 30 cm each upto 1.2 mtr from the ground level. The remaining external position shall be painted with two coat of aluminium paint including numbering to pole complete all as specified and directed. (Note:- Earth work, PCC work, shall be measured and paid separately.)4.00Each
11th Apr, 2026

6 Days Left

WhatsApp