Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Archaeological Survey Of India
Tender ID4450486
Organisation NameArchaeological Survey Of India
Tender BriefCombined Tender For Maintenance Of Monument In Sub Circle Itimad-ud-daulla Under Juridiction Of Agra Circle
Last Date For Submission22nd Jun, 2026
Opening Date23 Jun, 2026
Cost
Document Cost0.00
EMD99902.00
Estimated Cost3996083.00
Location
CityAgra
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Itimad-Ud-Daulla tomb, Agra Sweeping & cleaning the floor area 14367.34 Sqm. daily and partly roof area 2246.42 Sqm. weekly at Itimad-Ud-Daulla tomb, Agra. as so-called Main Mausoleum, Eastern Gate, Northern Gate, Southern Gate, Baradari complex, all Pathways, River side cells, burj, forecourt, ticket booking office, C.A's office, Baby feeding Room including removal of silt/debris from drains etc. including housekeeping of 2 nos. toilet block with 3 nos. number min. Safai Karmchari /equipment including materials, equipment s, T&P etc. during the year 2026-2027. Detail of Item for 1.00 Month:-. Unskilled Labour/Sweeping- 2 Nos. X 30 =60 Units, Nariyal broom- 4 kg., Phoose for soft broom and jala work- 04 Kg. , Sutli- .1 Kg. , Solid bamboo Rod 2" dia 6" long -02 Nos. 9.00Months
2Annual Maintenance of One R.O Plant 250 Lt/Hr. running water treatment plant 01 no. Water Coolers 150/150 Lit. capacity T&P etc. installed at Itimad-Ud-Daulla, Agra. (TDS report should be submitted in every month) during the year 2026-2027. :- Scope and Maintenance - (i) Filter & membrane of R.O plant, (iii) other minor repairing as taps, electric fitting, water supply fitting and R.O plant fittings, (iii) Man power 01 No. Expert R.O. Operator (Semi Skilled Labour), (iv) Expert Supervisor/ Engineer visit (two or more visits in a month as and when required) , (v) 01no.Water coolers150 /150 Lit capacity including stabilizer T&P etc. during the year 2026-27.9.00Months
3Housekeeping of the toilet block inner side of the monument of daily including 2 nos Indian toilet seats & 2 nos western toilet seat & 4 nos Urinal, 4 nos bash basin for Gents toilet & 2 nos Indian toilet seats & 2 nos western toilet sets, 3 nos bash basin for Ladies toilet as well as 1 nos western toilet, 1 Bash basin for physically handicap toilet seats , 2 nos western toilet seats , 2 wash basin in office area with minimum 2 Nos. Unskilled-Labour including material for cleaning from sunrise to sunset. Details of Item for 1.00 Month: - Unskilled Labour 2 Nos. X 30 = 60 Units, Phenoil 5 ltr. Cane- 5 -1Nos. duster-5 Nos. Harpic1 ltr -2 Ltr. , hand wash liquid soap dettol/ santoor 5 ltr pack- .5 , odonil 1 No. toilet Bruss-02 No. nepthalene balls 0.1 Kg. etc. (As per Analysis)9.00Months
4Mehtab Bagh,Agra Sweeping & Cleaning in Mehtab Bagh, all Pathways, structure, main entrance gate, steps, East side Burji, Store room, over area front road side, Yamuna side etc. approximate area 8405.08 Sqm. Daily sweeping by manual/mechanical including removal of vegetation growth with all sweeping & cleaning materials & minimum strength 2 Nos. Unskilled labour, during the year 2026-2027. Detail of Item for 1.00 Month: Unskilled Labour / Sweeping 2 Nos. X 26 = 52 Units, Nariyal broom - 5 Kg., Solid bamboo Rod 2" dia 6" long, 1 No. , Sutli, .5 kg. , Phoose for soft broom and jala work -4 Kg. etc.) 9.00Months
5Annual Maintenance of One R.O Plant 250 Lt/Hr. running water treatment plant 01 no. Water Coolers 150/150 Lit. Capacity T&P etc. installed at Mehtab Bagh, Agra. terms & condition (for Contractor ) (a) RO Plant room should be clean (b) Chemical required to be used (c) Filter to be changed as & when required(d) Maintenance of cooling system in all respect including compressor & all accessories (e) maintenance the water supply & electric supply with all accessories including submersible Pump of 1 Nos. 5 KVA &1 No 1.5 KVAwith penal & electric panel.(f) TDS report should be provided near the plant & a copy to be submitted along with bill (g) Total 1 No. R.O operator should be engaged regularly on time (h) Visit of engineer twice in a month for proper functioning of R.O plant (By Department- changing the membrane by the department when required) during the year 2026-2027.9.00Months
22nd Jun, 2026

22 Days Left