Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4073287 |
|---|---|
| Organisation Name | Uttar Pradesh Small Industries Corporation Limited |
| Tender Brief | Construction Of R.c.c. Retaining Wall At Ace Engineering College Toward,s Vill Surehara Mustakil, Vill-surehara Mustakil, Block-etmadpur, Distt-agra. |
| Last Date For Submission | 28th Apr, 2026 |
| Opening Date | 29 Apr, 2026 |
| Document Cost | 1180.00 |
|---|---|
| EMD | 13000.00 |
| Estimated Cost | 1271151.00 |
| City | Agra |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in Foundation for structure as per dwaring in ordinarysoil (loam Clay or sand) including lift up to 1.5 mtr. & lead upto 30 mtr. & including filling, watering and ramming of excavated earth into the trenches or in to space between the building and the sidding of foundation trenches or in to plinth and removale and disposal of surplus earth as directed by the engineer in charge of 30 mtr. from the foundation trenches. D.S.R. S.I. NO 251 | 70.20 | CuM |
| 2 | P/laying in cement concrete1:5:10 (1:cement, 5:courese sand, 10: graded stone ballast 40mm nominal size) including all chargres T&P etc required for propar completion of work D.S.R. S.I. NO 4.1 | 7.80 | CuM. |
| 3 | R.C.C. work with cement approved coarse sand 20 mm gauge stone grit in proportion of 1:1.5:3 in excluding supply of reinforcement and its bending but including its fixing and binding the same with 24B.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials. labour T&P etc. required for proper completion of the work including the cost of binding wire. D.S.R. S.I. NO 5.1.2(i) | 72.39 | CuM |
| 4 | M.S.(tor steel and plain) in plain work such as R.C.C. or R.B. work including for proper shape and including supply of steel & its wastage bend,hooks and authorised overlaping shall be measure and including cost of binding wire. D.S.R. S.I. NO 5.22.6 | 71.04 | Qtls |
| 5 | S/Fixing of Sign. Board | 1.00 | Nos. |
4 Days Left