Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Uttar Pradesh Housing And Development Board
Tender ID4037266
Organisation NameUttar Pradesh Housing And Development Board
Tender BriefConstruction Work Of Boundary Walls In Various Kasturba Gandhi Balika Vidyalayas At District -agra Under The Samagra Shiksha Abhiyan (package-2)
Last Date For Submission29th Apr, 2026
Opening Date30 Apr, 2026
Cost
Document Cost3540.00
EMD146000.00
Estimated Cost7280000.00
Location
CityAgra
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: All kinds of soil 0.30 m & Avobe454.91CUM
2Providing and laying Cement concrete 1:4:8 (1 cement : 4coarse sand : 8 graded stone ballast 40 mm nominal size) including supply of all materials.labour and T&P etc. required for proper completion of the work and curing complete. also including cost of formwork in foundation48.33CUM
3Providing and laying in position specfied grade of reinforcement cement concrete, excluding the cost of centering,shuttering,finishing & reinforcement. All work up to plinth level. 1:1.5:3 (1 cement,1.2 coarse sand zone-iii,3 graded stone aggregate 20mm. (Nominal size)145.31CUM
4Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 landings, balconies, shelves, chaijjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).62.23CUM
5Centering,shuttering inluding strutting,proping etc. & removal of form for. Foundations, footings, bases of columns, etc. for mass concrete.759.88SQM
29th Apr, 2026

11 Days Left

WhatsApp