Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3900772 |
|---|---|
| Organisation Name | Agra Development Authority |
| Tender Brief | Corrigendum : Beautification Work At Agra Inner Ring Road Junction, Kuberpur. |
| Last Date For Submission | 21st Apr, 2026 |
| Opening Date | 22 Apr, 2026 |
| Document Cost | 17700.00 |
|---|---|
| EMD | 687050.00 |
| Estimated Cost | 0.00 |
| City | Agra |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 8179.36 | Sqm |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in charge. 2.6.1 All kinds of soil | 931.60 | CUM |
| 3 | Filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (Soil density of 98%) after every four layers of compacted depth of fly ash, sides & top layer of filling shall be done with earth having total minimum compacted thickness 30 cm or as decided by Engineer -in-charge, including compacting each layer by rolling/ ramming and watering, all complete as per drawing and direction of Engineer -in - charge. | 745.28 | CUM |
| 4 | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. | 373.88 | CUM |
| 5 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 1345.50 | CUM |
4 Days Left