Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3751444 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Corrigendum : Installation Of Solar Rooftop On Govt Building Inspection House Aliganj And Office Of Provincial Division Pwd Etah Under Public Works Departments |
| Last Date For Submission | 2nd Apr, 2026 |
| Opening Date | 02 Apr, 2026 |
| Document Cost | 766.00 |
|---|---|
| EMD | 102000.00 |
| Estimated Cost | 0.00 |
| City | Agra |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Supplying Installation, Testing and Commissioning of on-grid Solar Photovoltaic Power Plant with 05 years comprehensive warranty and maintanance conforming to MNRE as amended consisting of Mono/Poly Crystalline silicon solar cells, Net metering facility, necessary protections, earthing, cabling, mounting on Aluminium/ G.I. structure of suitable strength with following components complete as required. a) Solar Photovoltaic Module of capacity 330 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730- Part-1&2, Solar Photovoltaic Module conversion shall not be less than 16.5% PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. b)Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 415 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC power with efficiency not less than 97% , total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 0C, The PCU shall adjust the voltage & frequency level to suit the grid voltage frequency (C) Data monitoring system complete with accessories. Fixing Array junction box & main junction box with IP 65 Protection & termination arrengement for incoming & outgoing cable along with glands, lugs etc as required. (D) Lightening & surge protection. Connection with supply & fixing required size XLPE insulated copper conductor 1.1KV grade armoured power & control cables between solar module, main power cables to grid supply PCU unit along with neccessory chanels /conduit, lugs etc complete in all respect. ( 0 0 0 ) | 5 | KW |
| 2 | Supplying Installation, Testing and Commissioning of on-grid Solar Photovoltaic Power Plant with 05 years comprehensive warranty and maintanance conforming to MNRE as amended consisting of Mono/Poly Crystalline silicon solar cells, Net metering facility, necessary protections, earthing, cabling, mounting on Aluminium/ G.I. structure of suitable strength with following components complete as required. a) Solar Photovoltaic Module of capacity 330 Wp or above, manufactured in India, conforming to IS 14286/IEC 61215, IS/IEC 61730- Part-1&2, Solar Photovoltaic Module conversion shall not be less than 16.5% PV modules used in solar power plants/ systems must be warranted for their output peak watt capacity, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years. b)Power Conditioning Unit (PCU) of 350-800 V DC Input voltage range and 415 V AC, three phase, 4 wire, 50Hz +/- 2.5 Hz, output voltage suitable to generate AC power with efficiency not less than 97% , total harmonic distortion less than 3% and suitable for ambient temperature from 0 to 50 0C, The PCU shall adjust the voltage & frequency level to suit the grid voltage frequency (C) Data monitoring system complete with accessories. Fixing Array junction box & main junction box with IP 65 Protection & termination arrengement for incoming & outgoing cable along with glands, lugs etc as required. (D) Lightening & surge protection. Connection with supply & fixing required size XLPE insulated copper conductor 1.1KV grade armoured power & control cables between solar module, main power cables to grid supply PCU unit along with neccessory chanels /conduit, lugs etc complete in all respect. ( 0 0 0 ) | 18 | KW |
5 Days Left