Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID4595150
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Repair / Maint Of Roof Treatment And Connected Works At Fatehgarh Cantt
Last Date For Submission10th Jul, 2026
Opening Date17 Jul, 2026
Cost
Document Cost500.00
EMD29960.00
Estimated Cost1498857.00
Location
CityAgra
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1M&L for removing existing water proofing treatment (including APP membrane, plaster, PCC padding, bricks tiles etc) of any description and any thickness and depositing of the dismantled material outside defence land, complete with roughing, sweeping and cleaning the surface, washing down and applying cement slurry @ 3 Kg/Sqm, complete all as specified and directed.1370.00Sqm
2M&L for average 40 mm thick cement concrete 1:2:4 Type B-0 (using 12.5 mm graded stone aggregate) laid on RCC roof surface, mixed with approved water proofing compound (WPC) @ 3% by weight of cement, finishing the surfaces even & smooth (without using extra cement) as directed including necessary form work complete all as specified and directed. Note :- (a) WPC will be measured and paid for separately under relevant item. (b) Taking down and refixing existing PVC water tanks, GI tubing and other connected services required for laying PCC shall be deemed to be included in the quoted rate and no extra payment shall be made to the contractor.1370.00Sqm
3M&L for preparation of new plastered roof surfaces, including cleaning the surface using wire brush / pressure hose and application of high performance polyurethane liquid membrane roof coating, applied cold in two coats @ minimum 1.5 Kg / Sqm total consumption by spray or brush application, having elongation of 300% to 700% and tensile strength not less than 3N /Sqmm as per ASTMD 412, crack bridging ability of 3.5mm as per ASTMC1305, shore A hardness not less than 60 as per ASTMD2240, including application of epoxy primer @ 0.15 Kg /Sqm and laying of 40 GSM geotextile over the first coat while the coat of wet, complete as per manufacturer's specification, sound engineering practices complete all as specified and directed. Note :- Work shall be executed by authorized applicator of manufacturer as per manufacturer's instruction and roof height upto double storey building .1370.00Sqm
4Supply only intergral water proofing compound (WPC) complete all as specified and directed.195.00Kg
5Taking up or down 20 mm bore steel tubing including all connections, complete all as specified and directed.65.00RM
10th Jul, 2026

6 Days Left