Tender BriefCorrigendum : Rubber Removal And Pme In Patches And Repainting To Runway At Af Stn Agra Under Ge (af) Tech Area Agra
Last Date For Submission6th Jun, 2026
Opening Date12 Jun, 2026
Cost
Document Cost500.00
EMD80000.00
Estimated Cost4000000.00
Location
CityAgra
StateUttar Pradesh

Register to see full details

BOQ Items
#ItemQtyUnits
1M&L for preparing of old black top surfaces by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surfaces with using air blowers to remove all loose dirt, rubber deposits complete and applying Polymer Modified Emulsion (PME) by spraying machine having penetration value 10-20 mm and initial setting time of 4-5 hours but not more than 8 hours. First coat with 0.6 Ltr (undiluted) PME diluted in 0.6 Ltr water to be applied uniformally on each 1.0 Sqm area mixed with mechanical filler as recommended by manufacturer of PME and ensure uniform finish of PME on flexible surface with mechanical application through spraying machine and using specially designed mopper for mopping the surface complete all as per manufacturer's instructions and complete all as directed. MAKE : M/s Ooms Polymer Modified Bitumen Pvt Ltd , M/s Hindustan Colas Pvt. ltd( HINMAT PLUS-PME), M/s L N Petro Chem Private Limited ( EMULCOTE) Notes :- The tenderer shall take into consideration for the following points while quoting his rate for this item 18000Sqm
2(a) The work shall be carried out through authorized and qualified applicators of the manufacturer. (b) Friction parameters shall be between 0.35 to 0.60 after application of PME. Contractor will make necessary arrangements for procurement of Portable Skid Resistance Tester (PSTR) and carry out necessary testing as directed without any extra cost to the department. (c) Two year warranty of material performance and application performance shall be obtained from the authrised manufacturer of PME. Warranty will include the fact that structure will remain water tight and no further cracks will be formed, excluding damage caused by natural calamities. Permeability test (ASTM D 2434) to be conducted on the surface prior and after to application of treatment. (d) A performance guarantee certificate for two years shall be submitted by the contractor to the GE on completion of work as specified. (e) Any number of trials patches of dimension 15mx15m at slected places for application of PME as directed by GE will be undetaken before commencement of treament. Friction parameters, permeability parameters to ensure zero porosity, penetration of PME after application of both coats and micro and macro textures will be determined through relevant testing methods as directed by GE/Engr-in-Charge. (Qty. will be measured and paid under relevant items of first coat and second coat of PME. (f) Care shall be taken to fill gaps/cracks up to 5mm size with mineral filler as per manufacturer's instructions.
3All as per item No 1 here-in-before but for second coat with 0.4Ltr (undiluted) PME diluted in 0.4 Ltr water to be applied uniformally on each 1.00 Sqm area (Second coat will be applied separately) after drying and setting of first coat. Note for item No 1 and 2 :- No price adjustment shall be done if PME used is more than 0.6 Ltr and 0.4 Ltr per Sqm of area in first and second coat respectively.18000Sqm
4M&L for removal of paintings(with or without rubber deposits ) with water based road marking paint/ thermoplastic paint on flexible and rigid surfaces of airfied using waterblasting cum vaccuming system with suitable machine and suitable operating pressure so that the total paint is removed from runway both (rigid and flexible) surfaces by the method of water blasting cum vaccuming system with suitable water pressure without use of any chemical & no damage to the existing surface complete all as specified and directed. NOTES :- (i) The work shall be carried out through authorized & qualified applicator. (ii) Total paint shall be removed and the debries /water to be vaccumed simultaneously leaving NO FOD so that the runway is available for operation immediately. (iii) The paint removal machine shall be SH8000, SH5000, SH3000 as approved by GE. (iv) Paint deposit debries should be in solid form when finally disposed. (v) In any emergency condition the machine should exit from the runway in less than 2 minutes without leaving FOD. 100Sqm
5M&L for Removal of Rubber deposits from runway surface using Water blasting cum vacuuming system with suitable machine and suitable operating pressure so that the total rubber deposits are removed from runway both (rigid and flexible) surfaces by the method of water blasting cum vacuuming system with suitable water pressure 'without use of any chemical & no damage to the existing surface complete all as specified and directed. NOTES : - (i) The work shall be carried out through authorized & qualified applicator (ii) Total rubber deposit should be removed and the Debris/ Water to be vacuumed simultaneously leaving No FOD so that the Runway is available for operation immediately. (iii) The rubber removal Machine shall be SH8000, SH5000, SH3000 as approved by GE. (iv) Rubber deposit Debris should be in solid form when finally disposed. (v) In any emergency condition the machine should exit from the runway in less than 2 minute without leaving FOD. (vi) Friction Test should be carried out before & after Rubber deposit removal operation. . (vii) After carrying out rubber removal operation on the runway , the friction reading of the rubber removed segment should bebetween 0.35 to 0.60. which shall be ensured by GE. (viii) Area of runway painting merged with rubber removal shall be measured and paid under item No. 03 i.e. removal of runway painting. 4400Sqm