Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4058021 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Special Repair To Road From Jcos Mess To Old Hangar In 9 Para Fd Regt Under Ge (west) Agra |
| Last Date For Submission | 18th May, 2026 |
| Opening Date | 25 May, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 27200.00 |
| Estimated Cost | 1360000.00 |
| City | Agra |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Preparing unsurfaced water bound macadam surfaces by brushing with wire brushes for removed caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunney bages to remove loose dirt etc complete all as specified and directed. | 103.00 | 10 Sqm |
| 2 | Scarifying or picking gravelled, macadam or bituminous macadam surfaces in surface n.exc. 50 mm deep and not exc. 100 mm deep in area exceeding 400 sqm complete all as specified and directed. | 103.00 | 10 Sqm |
| 3 | M&L for 150 mm thick (compacted thickness) WBM in two layers with coarse aggregates of grading 3 (63 to 40 mm size) or of grading 3 of (50 to 20 mm size) type aggregate granite, trap or basalt spread rolled and consolidated to gradient and camber required complete all as specified and directed. | 103.00 | 10 Sqm |
| 4 | M&L for applying evenly a priming / tack coat with bituminous primer (paving bitumen VG-10) @ 10 kg per 10 sqm over the preparing surfaces by mechanical sprayer complete all as specified and directed. | 103.00 | 10 Sqm |
| 5 | M&L for premix bituminous macadam (Design mix) (consolidated thicked 75 mm or less) with 4% binder content using paving bitumen VG-30 grade by weight of total mix laid and rolled and compacted to required camber and gradient with 8 to 10 tonne power road roller complete all as specified and directed. Note :- (a) Premix Bituminous macadam shall be obtained from hot mix plant and spreading shall be done with mechanical paver and asphaltic dense concrete work shall be done within 48 hours after completion of rolling and consolidation of bituminious macadam. (b) Contractor shall quote his rate on the basis of binder as mentioned in above item if there is any variation in the actual binder content used in lower side, the rate shall be adjusted @ Rs.45/Kg. However no price adjustment shall be made if the binder content works out to more than as specified above. | 51.00 | Cum |
6 Days Left