Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4074964 |
|---|---|
| Organisation Name | Municipal Corporation |
| Tender Brief | Request For Proposal (rfp) For Development Of Braj Sahitya Park At Shastri Puram Zonal Park, Agra |
| Last Date For Submission | 8th May, 2026 |
| Opening Date | 08 May, 2026 |
| Document Cost | 11800.00 |
|---|---|
| EMD | 1500000.00 |
| Estimated Cost | 74781441.00 |
| City | Agra |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam, clay, or sand) including lift upto 1.5 m and lead up to 30 m and including filling watering ramming of excavated earth in to the trenches or in to the space between the building and the sides of the foundation trenches or into the space between the building and the side of the foundation or in the plinth and removal & disposal of surplus earth as directed by E/I upto a distance of 30m.from the foundation trenches. Manual Work | 202.25 | Cum |
| 2 | Providing and laying cement concrete in 1:3:6 (1 Cement: 3 coarse sand :6 gladed stone aggregate 40 mm nominal size) and curing complete, lncluding cost Cu. M. 1160.00 5900.00 of form work in Foundation and floors. | 52.00 | Cum |
| 3 | Providing and laying cement concrete in 1:1.5:3 (1 Cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) and curing complete, lncluding cost of form work. ln Foundation and floors | 103.60 | Cum |
| 4 | Reinforced cement concrete work in walls (any thickness), including attachedpilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abulments, posts and struts etc. including cost ofcentering, shuttering, finishing and excluding reinforcement:1:1.5:3 (1 cement: 1.5 coarse sand :3graded stone aggregate 20 mm nominal size) | 7.50 | Cum |
| 5 | RCC work Providing and laying in position specified grade of reinforced cement concrete,Slab including the cost of centering, shutterang, finishing and excluding reinforcement - Above plinth level upto fifth floor lable :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone) | 14.00 | Cum |
14 Days Left