| 1 | Excavation for foundation up to 1.50 m depth, including sorting out and stacking of useful materials and disposal of excavated earth/materials with all leads, including all necessary machinery, tools, tackles, manpower and labour, complete as directed by the Engineer-in-Charge. (C) Hard Murrum. | 9.410 | cmt |
| 2 | Providing and laying cement concrete 1:4:8 (1 cement : 4 coarse sand : 8 hand-broken stone aggregates of 40 mm nominal size) and curing complete, excluding the cost of formwork, in (A) Foundations and Plinth, including all necessary machinery, tools, tackles, manpower and labour, complete as directed by the Engineer-in-Charge. | 11.600 | cmt |
| 3 | Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregates of 20 mm nominal size) and curing complete, excluding the cost of formwork and reinforcement, for reinforced concrete work in (A) Foundations, Footings, Bases of Columns and Mass Concrete, including all necessary machinery, tools, tackles, manpower and labour, complete as directed by the Engineer-in-Charge. | 8.250 | cmt |
| 4 | Providing formwork of ordinary timber planking to give a rough finish, including centering, shuttering, strutting, propping, etc., with height of propping and centering below the supporting floor/ceiling not exceeding 4.00 m, and removal of the same after completion, for in-situ reinforced concrete and plain concrete work in (A) Foundations, Footings, Bases of Columns and Mass Concrete, including all necessary machinery, tools, tackles, manpower and labour, complete as directed by the Engineer-in-Charge. | 30.990 | Smt |
| 5 | Providing Mild Steel reinforcement for RCC work, including cutting, bending, binding and placing in position, complete up to two-floor level, including all necessary machinery, tools, tackles, manpower and labour, complete as directed by the Engineer-in-Charge. | 423.930 | Kg |