| 1 | Earthwork in excavation by mechanical means for foundation, footings, walls, retaining walls, rafts, trenches, drains, lift pits, underground sumps, tank, septic tanks, soak well, Box cutting etc. including dewatering the sub-soil water from any source and rain water to keep the excavation dry, removal of slush, dressing of sides and ramming of bottoms, planking, strutting, removal and disposal of surplus excavated material with all lead and lift. including compaction by using mechanical plate compactor / vibro roller, finished to desire levels all as per excavation plan and foundation drawings to get Modified Proctor Density test (MPD) of 95Percentage, FDD and MDD etc., work including mechanical transport inclusive of royalty, statutory fees all permissions and any other incidental expenses etc. complete. (i) Hard Murrum, Up to 1.5 Mtr Depth | 522.000 | Cu.mt |
| 2 | Earthwork in excavation by mechanical means for foundation, footings, walls, retaining walls, rafts, trenches, drains, lift pits, underground sumps, tank, septic tanks, soak well, Box cutting etc. including dewatering the sub-soil water from any source and rain water to keep the excavation dry, removal of slush, dressing of sides and ramming of bottoms, planking, strutting, removal and disposal of surplus excavated material with all lead and lift. including compaction by using mechanical plate compactor / vibro roller, finished to desire levels all as per excavation plan and foundation drawings to get Modified Proctor Density test (MPD) of 95Percentage, FDD and MDD etc., work including mechanical transport inclusive of royalty, statutory fees all permissions and any other incidental expenses etc. complete. (ii) Hard Murrum, 1.5 Mtr. to 3.0 Mtr Depth | 147.000 | Cu.mt |
| 3 | Earthwork in excavation by mechanical means for foundation, footings, walls, retaining walls, rafts, trenches, drains, lift pits, underground sumps, tank, septic tanks, soak well, Box cutting etc. including dewatering the sub-soil water from any source and rain water to keep the excavation dry, removal of slush, dressing of sides and ramming of bottoms, planking, shoring and strutting, removal and disposal of surplus excavated material with all lead and lift. including compaction by using mechanical plate compactor / vibro roller, finished to desire levels all as per excavation plan and foundation drawings to get Modified Proctor Density test (MPD) of 95Percentage, FDD and MDD etc., work including mechanical transport inclusive of royalty, statutory fees all permissions and any other incidental expenses etc. complete. (iii) Hard Murrum, 3.0 Mtr. to 5.0 Mtr Depth | 4.000 | Cu.mt |
| 4 | Filling available excavated earth in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering. Rate to include cost of compaction to achieve at least 95Percentage Modified Proctor Density test (MPD), FDD and MDD of refilled excavated earth.Work shall complete as per the instruction of EIC. work complete including all type of tools, tackles, scaffolding, safety measures, loading, unloading, transportation, at all floors, all heights, all levels etc complete as per instruction of Architect/EIC. | 401.000 | Cu.mt |
| 5 | Earth Filling with murrum or approved quality earth in below flooring, sides of foundation, retaining wall, trenches, lift pits elsewhere directed in layers of not exceeding 150 mm thick including breaking clods, watering, compacting each layer of 150 mm thick with vibratory compactor and at inaccessible places with wooden/steel rammers to achieve 95Percentage Modified Proctor Density test (MPD), FDD and MDD at optimum moisture content, all leads and lifts. Bailing/pumping out of water to keep site dry while back filling ,Cost shall include conveyance of all materials, labor, machinery etc. complete (only good yellow soil/ muurum to be used for filling) Work shall complete as per the instruction of EIC. work complete including all type of tools, tackles, scaffolding, safety measures, loading, unloading, transportation, at all floors, all heights, all levels etc complete as per instruction of Architect/EIC. | 338.000 | Cu.mt |