| 1 | Earthwork in excavation by mechanical means for foundation, footings, walls, retaining walls, rafts, trenches, drains, lift pits, underground sumps, tank, septic tanks, soak well, Box cutting etc. including dewatering the sub-soil water from any source and rain water to keep the excavation dry, removal of slush, dressing of sides and ramming of bottoms, planking, shoring and strutting, removal and disposal of surplus excavated material with all lead and lift. including compaction by using mechanical plate compactor / vibro roller, finished to desire levels all as per excavation plan and foundation drawings to get Modified Proctor Density test (MPD) of 95Percentage., work including mechanical transport inclusive of royalty, statutory fees all permissions and any other incidental expenses etc. complete. i)sorting out and stacking of useful materials and disposing off the excavated stuff with all lead. Up to 1.5 Mtr Depth (C) Hard Murrum | 77.760 | Cu.mt |
| 2 | Providing and fixing pre-cast Rubber Dye / steel Dye inte locking concrete block 60mm thick with grade of concrete M300 pnumatic compressed / vibrated mechanically and as per approved design Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling and filling the joint with sand in proper line and level as per guidlines ofn IRC : SP 63-2018 etc. Complete. all materials, loading, unloading, transportation, placing at all floors and for all leads, at all floors, all levels, all heights and all shapes, all accessorie, protectiion sheet etc. work complete as per the detailed drawing, approved sample and instruction of Architect/EIC. | 288.000 | sqmt |
| 3 | Providing and laying cement concrete 1:4:8 (1- Cement : 4- coarse sand : 8- hand broken stone aggregates 40 mm nominal size) and curing complete excluding cost of formworkin (A) Foundation and Plinth all materials, loading, unloading, transportation, placing at all floors and for all leads, at all floors, all levels, all heights and all shapes, all accessorie, protectiion sheet etc. work complete as per the detailed drawing, approved sample and instruction of Architect/EIC. (minimum cement consumption 170 Kg/cmt) | 30.816 | cumt |
| 4 | TOTAL-06 Nos solar Parking Shade 1) 11kw solar parking shade system-02Nos -LOCATION-(Wandh-Guniyasr Mines and Roha-Kotda Mines ) (DCR PV module only) 2) 5.5kw solar parking shade system-04Nos -LOCATION-(Daban Mines ,Ratadiya Mines,Naredi Mines,Mothalaa Balachod Mines, ) (DCR PV module only) Supply, Installation, Testing and Commissioning of following size of Grid Tied Solar Power Plant with Solar Panels (ALMM approved): Frame Material : Anodized Aluminum alloy Frame With Twin Wall Profile, Front Solar Panels (ALMM approved): Frame Material : Anodized Aluminum alloy Frame With Twin Wall Profile, Front Cover : High Transmission Low-Iron Tempered Glass (AR Coated), High efficency and positive power tolerance Pmax: 0/+5,Module Efficiency should be approx. 18Percentage-21Percentage, Normal operating temperature 45'C, Junction Box with Waterproof IP67 and MC4 Compatible and Enclosed with Bypass diodes, 100Percentage Electroluminescence test to ensureerror free Modules, Thep. temp. co-efficient of the PV module shall equal or better than -0.45Percentage/degree C. Solar PV modules of minimum fill factor 75Percentage to be used. Unit Production:- 4 to 5 Unit /kw /day (Actual)(1Year Avg) With 10 year Product warranty and 25 year Linear Power Warranty.Solar Inverter: MPPT Range: 80-1000 V, Max efficiency: 97.5Percentage - 98.9Percentage, O/p Frequency: 50/60Hz, Operating Altitude (m) 4000, O/p Power Factor: ~1, O/P THDi: <3Percentage, Operating Tempreture Range: -25~60C, Anti-islanding Protection: Integrated, Input Reverse Polarity Protection Integrated, Insulation Resistor Detection Integrated, Residual Current Monitoring Unit Integrated, Output Over Current Protection Integrated, Output Short Circuit Protection Integrated, Output Over Voltage Protection Integrated, Protection Degree: IP65, User Interface LCD and APP .Datalogger and comunication:-GPRS /Wi-fi ,solar panel mounting,the structure should be suitable for carry the load of solar panel ,wiring etc.with necessary wall mount,j bolt,anchor fastner etc.the nut bolt used for installtion of structure should be(SS 304) quality and balance of system with necessary swithgear(suitable size and protection of ACDB and DCDB),inter connecting wiring,earting system,lightining arrrester system,Panel Auto Cleaning System with 1 HP motar (Total-06 Nos Motor) and Bidirctional Meter to solar plant aluminium armoured cable connectivity ( cable size 4Corex 25sq mm above ,Distance approx 1200 meter with excavation :-0.60*0.75 meter) (Total -06 Nos System cable) all liasoning work with various gov.department like state nodal agency Discom ,CEIG Total 06 Nos System Bidirectional Meter is included in agency scope.(including Energy Meter Protection Box made of Transparent Acrylic Sheet,GEDA application fees,solar connectivity charge,meter connectivity charge,Cable ,meter testing charges.).Providing and sealing joints between adjoining plates by applying minimum 40 mm wide self-adhesive aluminium foil tape and UL 746C certified silicone sealant at top surface of joints to make the parking shed roofing system watertight against rainwater and wash water seepage, complete as directed by Engineer-in-Charge.No water seepage will occur during the cleaning of the solar panels or during the monsoon period.all materials, loading, unloading, transportation, placing at all floors and for all leads, at all floors, all levels, all heights and all shapes, all accessorie, protectiion sheet etc. work complete as per the detailed drawing, approved sample and instruction of Architect/EIC. | 44.000 | per KW |
| 5 | Fabricated work: Providing Fabrication and erection of Steelstructure as per drawings including materials, consisting of plates, rolled Steel joists, channels, angles, chequered plates etc and also rectangular / square hollow Steel sections, insert plates in RCC/Brickwork, anchor bolts for Steel structure, sleeve pipes, anchor nuts, washers etc, straightening of raw steel if required, fabrication of steel structures with primer of zinc oxide and minimum two coats of anti corrosive matt finish paint including preparation of supplementary sketches and detailed bill of materials supply of bolts, nuts, washers, shims, packs, putty. gas, welding electrodes and all other consumables, as required and carrying out surface preparation all complete. The scope includes loading, transportation ,unloading and delivery and erection site of all fabricated structures,, alignment and welding of all structures true to line, level, plumb and dimension, including rectification if any, splicing, site assembly all as per technical specifications and drawings, ,all complete. Contactor shall provide stability certificate for the fabrication structure. Rate inclusive of shop drawing. work completed including mock up sample, all materials, loading, unloading, transportation, placing at all floors and for all leads, at all floors, all levels, all heights and all shapes, all accessorie, protectiion sheet etc. work complete as per the detailed drawing, approved sample and instruction of Architect/EIC. | 3663.790 | Kg |