Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID3791700
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Maintenance And Cleaning Of Sewage Line Including Sewage System, Chambers Septic Tank And Man Holes Soakage Pits Etc Under Age B/r-ii At Ge (n) Ahilyanagar
Last Date For Submission18th Apr, 2026
Opening Date20 Apr, 2026
Cost
Document Cost500.00
EMD98000.00
Estimated Cost4900000.00
Location
CityAhmednagar
StateMaharashtra

Register to see full details

BOQ Items
#ItemQtyUnits
1Demolition of cement concrete (un-reinforced) in ground floor & paving n.exc. 15cm thick below or above ground level.25.88Cum
2Earth work in excavation in any type of soil by mechanical means (Hydraulic excavator)/ in foundation trenches or drains not exceeeding 1.5m in depth (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. complete all as specified and directed by Engineer-in-Charge . Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr.800.00Cum
3Earth work in excavation in any type of soil by mechanical means (Hydraulic excavator)/ in foundation trenches or drains exceeeding 1.5m and n.exc 3.0m in depth (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. complete all as specified and directed by Engineer-in-Charge . Note :- Removal upto 50 m is already included in above item and no extra cost will be paid for removal upto 50mtr.80.00Cum
4Returning, filling in excavated material (soil) including spreading, levelling, watering and well ramming in layers not exc 25 cm in soft / loose soil etc complete all as specified and directed by Engineer-in-Charge 200.00Cum
5Removing surplus excavated soil to a distance exc 50 m and n.exc 100m deposited where directed at a level n.exc 1.5 m above the starting point etc complete all as specified and directed by Engineer-in-Charge 104.00Cum
18th Apr, 2026

6 Days Left