Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4246647 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | General Govt Tdmc Alappuzha Urgent Maintenance Work For Ladies Group Quarters Ladies Staff Quarters General Civil Work |
| Last Date For Submission | 18th May, 2026 |
| Opening Date | 20 May, 2026 |
| Document Cost | 1495.00 |
|---|---|
| EMD | 16949.00 |
| Estimated Cost | 677964.00 |
| City | Alappuzha |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Appendix - A | ||
| 2 | 26.28.3:Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge25 mm average thickness | 64.938 | sqm |
| 3 | 26.30.1:Drilling suitable holes in reinforced or plain cement concrete with power driven drill machine to a minimum depth of 100mm upto 200mm in RCC beams, lintels, columns and slabs to introduce steel bars for sunshades/balconies including fixing the steel bars in position using epoxy resin anchor grout of approved make but excluding the cost of reinforcement, all complete as per direction of Engineer-In-Charge.Upto and including 12mm dia. | 10.000 | holes |
| 4 | OD115085/2025-2026:Providing & fixing 10 mm dia Shear Connectors drilling holes of 14 mm dia in the concrete for a depth of 100 mm & cleaning the drilled holes using powered air blowers & fixing the connectors using Epoxy accelerate Anchor system as per drawings & specifications . The shear Connectors shall be welded to reinforcement for a minimum length of 50 mm. | 5.000 | each |
| 5 | 26.37:Cleaning of exposed concrete surface of sticking material including loose and foreign material by sand blasting with coarse sand followed by and including cleaning with oil free air blast as per direction of Engineer in charge. | 64.938 | sqm |
6 Days Left