Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3838959 |
|---|---|
| Organisation Name | Dakshinanchal Vidyut Vitran Nigam Limited |
| Tender Brief | Corrigendum : Maintenance Work Of 33kv Lines Under Eutd-i Aligarh |
| Last Date For Submission | 7th Apr, 2026 |
| Opening Date | 07 Apr, 2026 |
| Document Cost | 1180.00 |
|---|---|
| EMD | 10000.00 |
| Estimated Cost | 1000000.00 |
| City | Aligarh |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Cartage of 13 Mtrs. ST Poles from Store centre or any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. | 70.00 | No |
| 2 | Cartage of line material viz Conductor, GI earth wire, Cross Arm, Channel, Clamps & other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends also including the work of dragging etc. and also including the cost of labour, T&P carrier etc. required for proper completion of work. (Dist. 0 to 50 Kms.). | 500.00 | KG |
| 3 | Replacement of 33 KV damaged pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place and construction of round plinth around the S.T. Poles / Rails with cement, sand and concrete in 1:3:6 ratio of size 450 mm. dia & 600 mm height (300 mm. under the ground + 300 mm. over the ground). The plinth should be plastered with inch thick cement and sand of ratio 1:4 & taper rounding the upper most part of the plinth. Work including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer including the cost of all labour, T&P etc. (including carriage of damaged pole to JE Store/other place) required for proper completion of work. | ||
| 4 | 13 Mtrs. ST Poles | 52.00 | No |
| 5 | 13 Mtrs. ST Pole Double Support | 5.00 | No |
5 Days Left