Tendering Authority: Public Health Engineering Department
Tender ID2099643
Organisation NamePublic Health Engineering Department
Tender BriefCorrigendum : Construction Of Guard Room, Land Development, Construction Of Valve Chamber And Installation Of Different Dia Valve , Restoration Of Roads , Gap Joining With New Hdpe Pipeline And Allied Work For Jda Zone- I And Ii Pwss Area At Jaigaon
Last Date For Submission15th Jun, 2026
Opening Date17 Jun, 2026
Cost
Document Cost500.00
EMD174459.00
Estimated Cost8722955.00
Location
CityAlipurduar
StateWest Bengal

Register to see full details

BOQ Items
#ItemQtyUnits
1Earthwork in excavation of foundation trenches or drain in all sorts of soil (including mixed soil but exculding laterite or sand stone) including removing spreading or stacking the spoils, within a lead of 75 m as directed. The item includes necessary trimming the sides of trenches, leveling, dressing and removing the bottom, bailing out water as required complete. a) Depth of excavation not exceeding 1500 mm41.12cum
2Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work)With earth obtained from excavation of foundation11.32cum
3Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.111.39sqm
4Hire & labour charges for shuttering with centering & necessary staging upto 4 mtr using using approved stout props & thick hard wood planks of approved thickness with required bracings for concrete slabs, beams, column, liulop curved or straight including fitting fixing & striking out after completion of works.b) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge.46.03sqm
5Cement concrete with 30 mm down graded shigles excluding shuttering. in ground floor. 6:3:1 proportion10Cu.m