Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4357275 |
|---|---|
| Organisation Name | Irrigation And Waterways Department |
| Tender Brief | Corrigendum : Maintenance And Repair Of The Sisamara Embankment Along The Right Bank Of The Sisamara River Spanning A Length Of 130 Meters Upstream Portion Located At Natun Para Area Within Salkumarig.p Block Alipurduari P.s.alipurduar And District Alipurduar |
| Last Date For Submission | 26th May, 2026 |
| Opening Date | 26 May, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 31041.00 |
| Estimated Cost | 1552025.00 |
| City | Alipurduar |
|---|---|
| State | West Bengal |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Cutting and clearing jungles including shrubs, water weeds, bushes,trees, plants, upto 30 cm. girth including removing as directed by Engineer-in-charge. | 3000.00 | Sqm |
| 2 | Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer in Charge selected Quarrying site to the site of work including cost of materials, loading, unloading and carriage Including all incidental charges like Royalty and or Within wire netting of sausage for slope pitching and all lifts & dressing the exposed faces etc. Complete as per direction of the Engineer In Charge.(Quarry bed belongs to Forest Dept. Govt. Of WB). [ 70% 30kg ,20% 20kg,10% 10kg boulders used] N.B. The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non forest area as stated below to arive the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry,Commerce & Enterprises, Govt of West Bengal. (a) For Forest area Royalty including entry Fee & TP Fee: Rs.178.33 per Cum. (b) For Non-Forest area Royalty : Rs. 106.00 per Cum. Royalty (including other charges whereever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty (including other charges whereever applicable, but excluding GST) will be deducted from the bills of works. | 565.00 | Cum |
| 3 | Making rectangular / circular sausage cage with 10 SWG galvanized iron wire of 150 mm. x 150 mm. mesh wire netting with proper lapping of minimum 150 mm including sewing the joints with 12 SWG G I wire and supply of all materials and equipments including placing the sausage cage in position, filling the same with boulder or lump aggregates complete as per direction of the Engineer-in-charge but excluding the cost of boulder / lump aggregates and its carriage upto site.(Cost is excluding the cost of end pieces) h) 1.50 metre round sausage | 150.00 | Metre |
| 4 | Supplying, fitting, fixing end pieces for rectangular / square / circularsausages at the ends, with 10 SWG / 8 SWG G I wire net of differentmesh sizes tying & sewing the same maintaning a lap langth of 150 mmall around with 12 SWG G I wire complete, including the cost of supplyof wire netting,fitting etc, complete as per direction of the Engineer - in -charge. e) Mesh size 150 mm x 150 mm with 10 SWG wire | 459.01 | Sqm |
| 5 | Making rectangular / circular sausage cage with 10 SWG galvanized iron wire of 150 mm. x 150 mm. mesh wire-netting with proper lapping of minimum 150 mm including sewing the joints with 12 SWG GI wire and supply of all materials and equipments including placing the sausage cage in position, filling the same with boulder or lump aggregates complete as per direction of the Engineer-in-charge but excluding the cost of boulder / lump aggregates and its carriage up to site. (Cost is excluding the cost of end pieces) (d) 1.80 metre x 0.45 metre nominal section | 605.90 | Metre |
1 Days Left