Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4854027 |
|---|---|
| Organisation Name | Rural Engineering Department |
| Tender Brief | Construction Of Inter Locking Road Ward No 45 Chatnag Baccha Yadav Hosue To Vinod Srivastava House |
| Last Date For Submission | 11th Jul, 2026 |
| Opening Date | 11 Jul, 2026 |
| Document Cost | 2500.00 |
|---|---|
| EMD | 25000.00 |
| Estimated Cost | 1224000.00 |
| City | Allahabad |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clay or sand ) includig lift upto 1.50 metre and lead upto 30 metre . Including filling watering & ramming of excavated earth into the trenches of into the space between the building & the sides of foundation trenches or into the plinth & removal & disposal of surpluse earth as directed by the Engineer incharge upto a distance of 30 m from the foundation trenches. (Excluding Royality Rs. 30 ) As per S.I. No. 251 Excluding GST | 78.45 | cum |
| 2 | Concrete with 40mn gauge B/B, fine sand of 1.25 FM and Cement in proportion of 12:6:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. SI.N0.273 | 20.94 | cum |
| 3 | M-150 Brick work in 1:4 cement & fine sand (1.25 F.M.) mortar morter in foundation and plinth including supply of all materials, labour & tools & plants etc. required for proper completion of the work. Excluding GST. SI No. 305 | 45.21 | cum |
| 4 | 12mm thick plaster with 1:4 cement and find sand morter over brick or stone masonry work including supply of all materials, labour ,T&P etc. required for proper completion of the work . Exculding GST. As per S.I. No. 597 | 195.90 | cum |
| 5 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber applying stone screening/ binding materials to fill up the intersticks of coarse aggregate,watering and compacting to the required density Grade 3 as per technical specification clause 405. | 52.47 | cum |
4 Days Left