Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3991703 |
|---|---|
| Organisation Name | Public Health Engineering Department |
| Tender Brief | Construction And Commissioning Of New Single Phase 150mm Dia Tubewell In Subdivision Ramgarh, Thanagazi And Pratapgarh In The Jurisdiction Of Phed Rural Division Ii Ncr Alwar (annual Rate Contract) |
| Last Date For Submission | 23rd Apr, 2026 |
| Opening Date | 24 Apr, 2026 |
| Document Cost | 5000.00 |
|---|---|
| EMD | 200000.00 |
| Estimated Cost | 10000000.00 |
| City | Alwar |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Construction of tube well from ground level and up to 100 mtr depth and above to accommodate housing assembly pipe in all type of unconsolidated formation such as pebbles, boulders, collapsible formation etc. by Odex drilling method as per IS: IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work will include lowering of housing and strainer pipe assembly and casing shoe including cost of casing shoe, but excluding cost of the casing pipe. The work would be completed after obtaining sand free water. Nominal Bore 150 mm dia. | 1.00 | Mtr |
| 2 | Add 15% extra on above item (Item No 2.6.1 to 2.6.3) for drilling depth beyond 100 mtr, rate shall be applicable for only extra depth beyond 100 mtr . | 1.00 | Mtr |
| 3 | Construction of Tube Well up to 100 mtr. depth in all type of rocks by DTH system & over burden to accommodate casing pipe of following sizes in all types of soils & over burden including lowering of casing pipes, (if required) excluding cost of casing pipes, as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work would be completed after obtaining sand free water. The tube well should have a through out bore as per nominal dia of casing pipe. Nominal bore 150 mm dia | 1.00 | Mtr |
| 4 | Add 15% extra on above item for drilling depth beyond 100 mtr, If depth of bore is more than 100 mtr. | 1.00 | Mtr |
| 5 | Construction of tube well from ground level & up to 100 mtr depth to accommodate housing and assembly pipe of following sizes in all type of alluvium strata unconsolidated formation such as pebbles, boulders etc. by percussion/rotary drilling method as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications, with gravel as per IS:4097-1967 and it's packing as per IS: 2800 (Part I & II) 1979 as amended up to date (the work includes the cost of gravel & it's primary packing and packing during development, lowering of housing & strainer assembly pipes with supply and wrapping of coir-rope, wherever necessary for arresting fine sand particles and development work, but excluding the cost of housing and strainer pipe assembly). The work would be completed after obtaining sand free water. |
9 Days Left