Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4398200 |
|---|---|
| Organisation Name | State Agricultural Marketing Board |
| Tender Brief | Corrigendum : Development Work Of Internal Road And Toilet Block At Mandi Yard, Govindgarh Distt Alwar |
| Last Date For Submission | 12th Jun, 2026 |
| Opening Date | 15 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 47600.00 |
| Estimated Cost | 2380000.00 |
| City | Alwar |
|---|---|
| State | Rajasthan |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | PART- "A" | ||
| 2 | Dismantling of Flexible PavementsDismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202By Mechanical MeansBituminous Courses & Granular Courses | 58.00 | Cum |
| 3 | Loading and Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Manual MeansLoading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead upto 30 m | 58.00 | Cum |
| 4 | Dismantling of Cement Concrete Pavements as per MoRTH Specification Clause 202.Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 20.00 | Cum |
| 5 | Granular Sub-Base with Close Graded Material (Table:- 400-1)Plant Mix MethodProviding laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means.For Grading-III Material | 134.00 | Cum |
6 Days Left