Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Haryana Urban Development Authority
Tender ID3996223
Organisation NameHaryana Urban Development Authority
Tender BriefAmtc Of Ephs In Sector 34 Ue Ambala Cantt Laying 200mm Di Line And Construction Of New Sewer Manholes Complete In All Respect And All Other Works Contingent Thereto
Last Date For Submission18th Apr, 2026
Opening Date20 Apr, 2026
Cost
Document Cost250.00
EMD3380.00
Estimated Cost168560.00
Location
CityAmbala
StateHaryana

Register to see full details

BOQ Items
#ItemQtyUnits
1[11.5.2]12 mm cement plaster of mix : 2. 1:3 (1 cement: 3 fine sand)19.920Sqm
2[20.63.3]`Providing, lowering, laying in trenches, aligning, fixing in position and jointing Ductile Iron (DI) ISI marked K-9 grade SandS pipes as per 15:8329-2000 (amended up to date), with internal cement mortar lining for potable water with rubber ring (EPDM/SBR) joints as per IS: 5382-1985 (excluding special accessories) complete including all material, labour, hydraulic testing and commissioning as per Technical Specifications and as per direction of Engineer. Note: E/W to be measured and paid separately. ` 3. 200 mm i/d58.000Per Metre
3[21.93.1]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 1. Type:- Extra Heavy Duty Set (EHD-35) 560MM Clear Opening2.000Each
4[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil.73.000cum
5[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)4.410cum
18th Apr, 2026

4 Days Left

WhatsApp