Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID4075775
Organisation NameMilitary Engineer Services
Tender BriefCa No Ge South Amb 86 2025 2026 Special Repair To Building No Ht-07 Under Ge (south) Ambala Cantt
Last Date For Submission13th May, 2026
Opening Date15 May, 2026
Cost
Document Cost500.00
EMD88576.00
Estimated Cost4428800.00
Location
CityAmbala
StateHaryana

Register to see full details

BOQ Items
#ItemQtyUnits
1Demolition of Mud in roofs, any thickness, including plastering and leeping (whether full thickness removed or only a part thereof) and cleaning the surfaces with wire brush and removal of the same outside defence land,complete,all as specified and as directed.16.30CUBIC METER
2Dismantling of brick or terracing tiles of single layers on roofs and removal from site, complete all as specified and as directed.163.00SQUARE METER
3Material and labour for Plain cement concrete 1:2:4 type B-1, using 20 mm graded mechanically crushed stone aggregates as in padding to roof to maintain the required slope and finished the surface even and smooth without using extra cement, complete all as specified and directed by Engineer-in-Charge.6.52CUBIC METER
4Matrerial and labour for 20mm thick grit plastering in 1:3 ( 1 portion cement and 3 portion 0 to 5 mm aggregate) over the roof surfaces with water proofing compound ( as per manufacturers instruction) all as specified and directed. NOTE: - WPC shall be measured and paid separately.163.00SQUARE METER
5Material and labour for water proofing treatment with following application over roofs surface complete all as specified and directed : - (i) Applying bituminous primer at the rate of 0.4 Litres/Sqm as per IS 3384-1986 on prepared surfaces of roof. Surface shall be kept free, till the primer is impregnated and the solvent oil in the primer get evaporated. (ii) Applying one coat of blown type bitumen of grade 85/25 as binding material conforming to IS-73 at the rate of 1.2 Kg/Sqm. (iii) Laying 3mm thick APP polymeric water proofing membrane of weight not less than 3.0 Kg/Sqm, black finish reinforced with non woven polyster matt, with a thermo fusible finish, torch application, overlaps with a propane or a butane gas torch, with a overlap of 75mm at sides and 100mm at the ends and sealing including applying a coat of cold emulsion bituminous primer all as per manufacturers instruction including preparation of surface. (iv) Top of membrane shall be provide with solar reflective bituminous aluminum paint @ 0.1 Kg/Sqm as prescribed by manufacture of membrane. Note :- The water proofing treatment shall be carried out by the manufacturer or his authorised applicators in terms of clause 11.43 of MES Sch Part-I (2009).210.00SQUARE METER
13th May, 2026

19 Days Left

WhatsApp