Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID3703009
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Ca No Cwe/amb/utility-58 Of 2025-26 Repair/maint Of Eot/hot Cranes And Allied Work Under Ge (utility) Ambala Cantt
Last Date For Submission2nd Apr, 2026
Opening Date04 Apr, 2026
Cost
Document Cost500.00
EMD26000.00
Estimated Cost1300000.00
Location
CityAmbala
StateHaryana

Register to see full details

BOQ Items
#ItemQtyUnits
1Material and Labour for periodic inspection/servicing to be carried out in every three months, and making/keeping the cranes serviceable, for cranes of 2 Ton/ 5 Ton capacity installed in various bldgs, including the following:- (i) LONG TRAVEL MOTION AND CROSS TRAVEL MOTION (a) Checking Gear box oil level and filling with required oil and rectification of leakages if any.(Note: Gear Oil shall be measured and paid separately at supply only rates) (b) Brake adjustment (c) Checking of Long travel & cross travel wheel for any noise/malfunctioning. (d) Checking grease of Geared couplings, nut tightening and replacement of grease nipple every three months. (e) Checking of oil in Hydraulic thruster brake, rectification of leakages if any and filling with required quantity of oil.(Note: Brake Oil shall be measured and paid separately as supply only rates) (f) Checking of electric motor connections, insulation resistance value etc. (g) Checking the cut-off at extreme ends with the limit switch. (j) Checking and greasing of shaft pedestal. 18.00Each Job
2(ii) HOIST MOTION (a) Checking Gear box oil level and filling with required oil and rectification of leakages if any.(Note: Gear Oil shall be measured and paid separately at supply only rates) (b) Brake adjustment (c) Checking of main bearings of the Rope Drum including greasing the same (d) Checking grease of Geared couplings and nut tightening. (e) Checking of oil in Hydraulic thruster brake, rectification of leakages if any and filling with required quantity of oil.(Note: Brake Oil shall be measured and paid separately at supply only rates) (f) Checking of electric motor connections, insulation resistance value. (g) Checking wire rope for any damage & greasing the rope. (h) Adjustment of the rotary limit switch. (j) Checking of Bearing of the Hook and greasing the same. (iii) ELECTRICAL PANEL (a) Checking the contactors for overheating or flashing. (b) General checking of contacts and connections. (c) Cleaning of control panels and checking of connections. (d) Checking of connections of VVVF drives/other drive, calibrating VVVF drive to get smooth movement & maximum efficiency / other drives for smooth functioning of the same. Note: Nos of Cranes 2 Ton -04 Nos and 5 Ton -02 Nos.
3Material and labour for load testing and provide certification from authorised crane inspector all as specified for the EOT/HOT crane 2 ton capacity by dead weight at site, to be carried out 110% of rated capacity. Test load and slings for conducting the full load and 10% over load test will be arranged by the contractor at site. Note :- i) Dead load shall be arranged by the contractor on his own arrangment and no extra payment shall be made by the department. ii) Tools and tackels shall be provided by the contractor at site for testing purpose without any extra cost to department. iii) Rates quoted against this item shall also be deemed to be inclusive for shifting/transporting the load from place to place and unloading which will be arranged by the contractor including required ropes, manpower etc for handling the load required for load testing.4.00Each Job
4All as per serial item No 2.00 above but 5 ton capacity.2.00Each
5Dismantling of existing reduction gear box with device for hoist/CT/LT motion traverse for carrying out replacement of following unserviceable Parts / Carrying out misc repair and refixing the gear box after checking alignment of brake drum & motor and motor & gearbox , in existing position, complete all as specified and directed:- (a) Replacing the worn out shaft seals & bearing (b) Replacement of internal cover gasket, (c) Replecment of Gear coupling with nuts & bolts complete.2.00Each Job
2nd Apr, 2026

6 Days Left