Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3708987 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Ca No Cwe/amb/utility-88 Of 2025-26 Repair/ Maint Of 11 Kv Ht Network Ht Vcbs Rmus Distribution Transformers And Allied Works Under Sector A Under Ge (utility) Ambala Cantt |
| Last Date For Submission | 9th Apr, 2026 |
| Opening Date | 11 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 68000.00 |
| Estimated Cost | 3397000.00 |
| City | Ambala |
|---|---|
| State | Haryana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavation in trenches in soft/loose soil n.exc 1.5 Mtr deep and n.exc 1.5 mtr wide for laying of HT cable and getting out including dressing/trimming of sides and leveling, grading and ramming of bottom of excavation complete all as specified and as directed. | 133.92 | CUBIC METRE |
| 2 | ditto- but exceeding 1.5 mtr deep but not exc 3.0mtr deep complete all as specified and as directed. | 1.30 | CUBIC METRE |
| 3 | M&L for fine and dry sand cushioning to under ground cable including provision of layers of sand 8 cm deep before laying and 15cm deep after laying the cable and stretching of cable complete all as specified and as directed. | 25.92 | CUBIC METRE |
| 4 | Supplying and laying un-reinforced precast concrete cable cover, class precast concrete cable cover, class HV,Type 1 with peak, size 300mm x 180 mm x 40 mm complete all as specified and as directed. | 1780.00 | EACH |
| 5 | Dismantling and taking down old unsv PCC HT pole and Supply, transportation upto site of work and erection of pre stressed concrete pole in vertical position 11 Mtr long 152x152 at top and 152mmx260mm at bottom class-9 conforming to IS-1678 and including marking alternate 05 Nos white and black strip 30cm height with two coats of synthetic enamel paint incl numbering on poles complete all as specified and as directed.. (Note:Excavation and earth wok and PCC for foundation, channel, clamps nuts, bolts to be measured and paid separately ). | 4.00 | EACH |
6 Days Left