Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3866324 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Ca No Ge(n)amb-95/2025-26 Special Repair Of Building No P-53a (pers Cook House) Of Fd Hosp Under Ge(n) At Ambala Cantt |
| Last Date For Submission | 27th Apr, 2026 |
| Opening Date | 29 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 52820.00 |
| Estimated Cost | 2641000.00 |
| City | Ambala |
|---|---|
| State | Haryana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Schedule 'A' Part-I (B/R itmes) Taking down cement or cement lime plaster of any description on brick or stone walls, etc. including racking out joints, hacking for key scrubbing down with water, etc. ,complete all as specified and as directed. | 370.00 | Square metre |
| 2 | Material and labour for rendering 15mm thick on any faces of brick work or concrete wall surfaces in cement mortar (1:6) and finished even and smooth without using extra cement, complete, all as specified and as directed. | 60.00 | Square metre |
| 3 | Material and labour for rough cast plaster complete as specified in SSR Part-I, clause 14.22 shall consisting of following:- firstly apply under coat in cement mortar 1:4 not less than 10 mm thick and while still it is in plastic state the rough cast mixture consisting of crushed stone or fine stone aggregate of size between 6 to 12 mm as per the texture required mixed with coarse sand and cement in the ratio 1:1:1 shall be applied, complete all as specified and as directed by the Engineer-in-Charge. | 210.00 | Square metre |
| 4 | Forming groove of uniform size 15mm wide and 15mm deep in the top layer of washed stone grit plaster as per approved pattern using wooden battens,nailed to the under layer including removal of wooden battens, repair to the edges of panels and finishing the groovecomplete as per specifications and direction. | 450.00 | Running metre |
| 5 | Material and labour rendering 15 mm thick on brick work or concrete wall surfaces in cement mortar 1:4 including mixing water proofing compound @ 2% by weight of cement or as per manufacturer's instruction and finished fair and even without using extra cement complete all as specified and as directed by the Engineer-in-Charge. ( Note- WPC shall be measured paid for separately) | 40.00 | Square metre |
6 Days Left