Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Military Engineer Services
Tender ID3866324
Organisation NameMilitary Engineer Services
Tender BriefCorrigendum : Ca No Ge(n)amb-95/2025-26 Special Repair Of Building No P-53a (pers Cook House) Of Fd Hosp Under Ge(n) At Ambala Cantt
Last Date For Submission27th Apr, 2026
Opening Date29 Apr, 2026
Cost
Document Cost500.00
EMD52820.00
Estimated Cost2641000.00
Location
CityAmbala
StateHaryana

Register to see full details

BOQ Items
#ItemQtyUnits
1Schedule 'A' Part-I (B/R itmes) Taking down cement or cement lime plaster of any description on brick or stone walls, etc. including racking out joints, hacking for key scrubbing down with water, etc. ,complete all as specified and as directed.370.00Square metre
2Material and labour for rendering 15mm thick on any faces of brick work or concrete wall surfaces in cement mortar (1:6) and finished even and smooth without using extra cement, complete, all as specified and as directed.60.00Square metre
3Material and labour for rough cast plaster complete as specified in SSR Part-I, clause 14.22 shall consisting of following:- firstly apply under coat in cement mortar 1:4 not less than 10 mm thick and while still it is in plastic state the rough cast mixture consisting of crushed stone or fine stone aggregate of size between 6 to 12 mm as per the texture required mixed with coarse sand and cement in the ratio 1:1:1 shall be applied, complete all as specified and as directed by the Engineer-in-Charge.210.00Square metre
4Forming groove of uniform size 15mm wide and 15mm deep in the top layer of washed stone grit plaster as per approved pattern using wooden battens,nailed to the under layer including removal of wooden battens, repair to the edges of panels and finishing the groovecomplete as per specifications and direction.450.00Running metre
5Material and labour rendering 15 mm thick on brick work or concrete wall surfaces in cement mortar 1:4 including mixing water proofing compound @ 2% by weight of cement or as per manufacturer's instruction and finished fair and even without using extra cement complete all as specified and as directed by the Engineer-in-Charge. ( Note- WPC shall be measured paid for separately)40.00Square metre
27th Apr, 2026

6 Days Left

WhatsApp