Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4337851 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Comprehensive Maintenance Of Em Installations With Allied Works At Alfa Ph Under Ge Utility Ambala |
| Last Date For Submission | 17th Jun, 2026 |
| Opening Date | 19 Jun, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 70000.00 |
| Estimated Cost | 3500000.00 |
| City | Ambala |
|---|---|
| State | Haryana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Rectification of complaints at Alfa Power House AoR of HT UG/OH electric distribution network by attendng daily complaints including Sunday and other holidays for round the clock and making the same serviceable in all respects alongwith replacement of any major part including small length of cable (not more than 20 mtr), adhesive tape and other connected minor accessories shall also include visual inspection of OH lines, Earth Resistance of transformer, switch gear, GOD switch etc. Quoted rate also include excavation of faulty cable and making seviceable with accessories like joints, Fuse wire for GOD switch complete all as specified and directed. | 3500.00 | Each Complaint |
| 2 | Rectification of complaints at Alfa Power House AoR of LT UG /OH electric distribution network, street and seurity lights by attendng daily complaints including Sunday and other holidays for round the clock and making the same serviceable in all respects alongwith replacement of any major part including small length of cable (not more than 20 mtr), adhesive tape and other connected minor accessories shall also include visual inspection of OH lines, Earth Resistance of transformer, switch gear, GOD switch etc. Quoted rate also include excavation of faulty cable and making seviceable with accessories of all nature like No light, faulty insulator, broken conductor & cable fault , burnt out MCCB`s, MCBs, isolators, switch fuses, service cables etc upto DB in buildings/OTM complete all as specified and directed. | 4200.00 | Each Complaint |
| 3 | Note for Ser Item No 1.00 & 2.00:- (i) Any complaint left unattended will be communicated to the JE in-charge /AGE E/M with reason. Penalty of Rs. 200/- per day will be levied from the contractor if the complaint is not attended and completed within 24 hours. (ii) Material required for completing the job shall be measured and paid for separately under relevant items of BOQ. (iii) Contractor shall provide all type of T&P of LT street lights network, bamboo ladder with safety gloves for attending the external electric complaints. (iv) Contractor shall provide the complaint register 200 pages 3 No, complaint book with 100 slips- 5 No. Booklets serially numbered in triplicate. (v) Contractor will provide adequate/ sufficient No of manpower round the clock including Sunday & holidays to receive and attend Complaints. (vi) Cost of materials for laying of cables, stretching of OH conductor, burnt out joints, fuse wires, insulator and jumper will be measured and paid separately under relevant items as Material & Labour. (vii) The scope of work cover all complaints received from above concern power houses will be lodged/ docketed/ attended/ completed. The completion will be rendered on complaint register as well as on docket. Nature of fault may occurs given below :- (a) Blown out fuses (b) Faulty Insulator (c) Loose GOD male & female contact (d) Faulty cable joint (e) O/H conductor broken | ||
| 4 | (f) Broken jumpers (g) Tightening of stay (h) Stretching of broken loose fault conductor and binding on insulators up to 3 span (j) Contractor will provide all the tools such as HT/LT meggar, Insulation Tester, Wrench, Rope, Bamboo ladder, search light and other tools and will maintain them in working condition all the time. (k) Tightening of service connection as preventive maintenance. (l) Proper Uniform shall be provided by the contractor for persons employed on duty as directed by Engr-in-Charge. (m) Tracing fault manually in LT/HT electric lines and underground cable network. (n) AC Complaints like connection / disconnection (o) Fault HT/LT switchgears (p) Switching ON/OFF street lights at appropriate time as directed by JE/Engr-in-Charge. Penal recovery for Rs 100/- per day will be recovered if street light are not put ON/OFF at appropriate time. (q) The area covered under the above power house consists of HT/LT overhead lines. HT/LT underground cables, distribution transformers, HT/LT switch gears, streer lights etc, including HT 11 KV incoming and numbers of outgoing HT feeders for the complete area. | ||
| 5 | (r) Any other electric complaint which is considered essential by the department. (s) Confirmation on completion of any nature of major complaints will be intimated to JE EM or Engr-in-Charge immediately. (t) The contractor will observe all labour laws as prevalent during the currency of work enacted by Central/State Deptt as well as Labour Commissioner Act. He shall also ensure, payment of minimum wages to the persons employed as per labour laws in vogue. (u) The contractor will provide the rain coats, gum boot and hand gloves in winter and summer season. (v) Contractor will have no rights to object the work carrying out by other contractor at substation or HT/LT distribution system of the power house area under comprehensive maintenance. However necessary handing taking over the assets will be carried out between the agencies. (w) Contractor will provide necessary vehicle for attending the complaint under above power house area. |
6 Days Left