| 1 | Material and labour for taking down the old ceiling fan of any make and Supply and fixing connecting & testing of ceiling fan complete with blades, down rods, fan regulator socket type and accesssories, 230V , 1200mm sweep , Min air delivery 210 CFM with service value 6.00 BEE five star rated with brushless direct current motor (BLDC) without reomte complete all as directed.
Notes:- (a) Old taking down ceiling fan shall be deposited to E/M-II store yard.
(b) The above appliances may be procured either directly from the manufacturer or their authorised dealers. In both cases, a "Pre dispatch" inspection at the "Factory Premises" shall be carried out by the Engineer-in-Charge alongwuth the representative of "Accepting Officer" to verify the major sepifications, star rating and factory test results. All such record shall be produced before the GE while releasing payment to the contractor. The "Pre dispatch" inspection shall be coordinated by the contractor to facilitate the necessary checks and verification. | 339.00 | Each |
| 2 | Material and labour for taking down the old ceiling fan of any make and Supply and fixing connecting & testing of ceiling fan complete with blades, down rods, fan regulator socket type and accesssories, 230V , 1400 sweep , Min air delivery 245 CFM with service value 6.00 BEE five star rated with brushless direct current motor (BLDC) without reomte complete all as directed.
Notes:- (a) Old taking down ceiling fan shall be deposited to E/M-II store yard.
(b) The above appliances may be procured either directly from the manufacturer or their authorised dealers. In both cases, a "Pre dispatch" inspection at the "Factory Premises" shall be carried out by the Engineer-in-Charge alongwuth the representative of "Accepting Officer" to verify the major sepifications, star rating and factory test results. All such record shall be produced before the GE while releasing payment to the contractor. The "Pre dispatch" inspection shall be coordinated by the contractor to facilitate the necessary checks and verification. | 478.00 | Each |
| 3 | Material and labour for taking down the old exhaust fan of any make and Supply and fixing exhaust fan 300 mm sweep, anti corrsive metal body, sturdy metal bird guard copper wounded, double ball bearing, five star rating,1320 RPM,50HZ, 240 volts complete with dynamically balanced blade for vibration free rotation, split pin, clamp and fixing at site on and including MS fabricated base frame using flexible wire after making hole in wall as required at site and making good the disturbed surfaces and including making the electrical connection by using three core wire with colour code complete all as specified and as directed by Engineer-in-Charge.
Notes:- Old taking down exhaust fan shall be deposited to E/M-II store yard.
(b) The above appliances may be procured either directly from the manufacturer or their authorised dealers. In both cases, a "Pre dispatch" inspection at the "Factory Premises" shall be carried out by the Engineer-in-Charge alongwuth the representative of "Accepting Officer" to verify the major sepifications, star rating and factory test results. All such record shall be produced before the GE while releasing payment to the contractor. The "Pre dispatch" inspection shall be coordinated by the contractor to facilitate the necessary checks and verification. | 8.00 | Each |
| 4 | Material and labour for taking down the old exhaust fan of any make and Supply and fixing exhaust fan 450 mm sweep, anti corrsive metal body, sturdy metal bird guard copper wounded, double ball bearing, five star rating,1320 RPM,50HZ, 240 volts complete with dynamically balanced blade for vibration free rotation, split pin, clamp and fixing at site on and including MS fabricated base frame using flexible wire after making hole in wall as required at site and making good the disturbed surfaces and including making the electrical connection by using three core wire with colour code complete all as specified and as directed by Engineer-in-Charge.
Notes:- Old taking down exhaust fan shall be deposited to E/M-II store yard.
(b) The above appliances may be procured either directly from the manufacturer or their authorised dealers. In both cases, a "Pre dispatch" inspection at the "Factory Premises" shall be carried out by the Engineer-in-Charge alongwuth the representative of "Accepting Officer" to verify the major sepifications, star rating and factory test results. All such record shall be produced before the GE while releasing payment to the contractor. The "Pre dispatch" inspection shall be coordinated by the contractor to facilitate the necessary checks and verification. | 23.00 | Each |
| 5 | Material and labour for taking down the old split type unit of any make and capcity and Supply and fixing connecting & testing of air cooled split unit indoor & outdoor complete with cordless remote control unit air conditioner electric driven,single phase 230V, 50 hz, turbo cooling, inverter type of capacity of 1.5 TR, BEE 5 star rated inverter split AC with anti dust filter, copper condensor, R-32 refrigerant,Environment friendly- no ozone depletion potential & low global warming potential with & including suitable MS mounting stands for indoor and outdoor unit including connecting Cu cable and connecting copper pipe up to 5 mtr length, drain pipe, energy efficient, high ambient cooling, anti microbial air filtration, self dignosis, LED Display and Completed all as specified and directed. NOTES :
(a). The rates quoted shall deem to include the cost of cutting holes in the brick wall for passing copper tubing and making good the surfcaes to match with adjoining surfaces include fixing with angle iron into any type of wall for out door unit whereever reqd.
(b). Old taking down split AC shall be deposited to E/M-II store yard.
(c) The above appliances may be procured either directly from the manufacturer or their authorised dealers. In both cases, a "Pre dispatch" inspection at the "Factory Premises" shall be carried out by the Engineer-in-Charge alongwuth the representative of "Accepting Officer" to verify the major sepifications, star rating and factory test results. All such record shall be produced before the GE while releasing payment to the contractor. The "Pre dispatch" inspection shall be coordinated by the contractor to facilitate the necessary checks and verification. | 18.00 | Each |