Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 3866312 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Special Repair To Building No P-343 Of 40 Arty And Special Repair To Building No Ht-21 Of Office Complex At Under Age B/r-i Of Ge (north) Ambala Cantt |
| Last Date For Submission | 27th Apr, 2026 |
| Opening Date | 29 Apr, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 34880.00 |
| Estimated Cost | 1744000.00 |
| City | Ambala |
|---|---|
| State | Haryana |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Schedule 'A' Part-I (B/R itmes) Taking down cement or cement lime plaster of any description on brick or stone walls, etc. including racking out joints, hacking for key scrubbing down with water, etc. ,complete all as specified and as directed. | 630.00 | Square metre |
| 2 | Material and labour for 12 mm thick rendering or plastering using polymer modified ready mix plaster mortar of fine grade Portland cement, graded sand and polymer with water soluble additives as per manufacture's specifications of approved make, on any faces of brick work or concrete wall surfaces and finished even and smooth without using extra cement, complete, all as specified and as directed by the Engineer in charge. Make:- Smart care ready mix plaster of Asian paint or equivalent in Berger/Ultra tech/Pidilite | 420.00 | Square metre |
| 3 | Material and labour for rough cast plaster complete as specified in SSR Part-I, clause 14.22 shall consisting of following:- firstly apply under coat in cement mortar 1:4 not less than 10 mm thick and while still it is in plastic state the rough cast mixture consisting of crushed stone or fine stone aggregate of size between 6 to 12 mm as per the texture required mixed with coarse sand and cement in the ratio 1:1:1 shall be applied, ,complete all as specified and as directed.. | 57.00 | Square metre |
| 4 | Material and labour rendering 15 mm thick on brick work or concrete wall surfaces in cement mortar 1:4 including mixing water proofing compound @ 2% by weight of cement or as per manufacturer's instruction and finished fair and even without using extra cement ,complete all as specified and as directed.. ( Note- The cost of providing WPC shall be measured and paid for separately) | 30.00 | Square metre |
| 5 | Supply only water proofing compound ,complete all as specified and as directed.. | 5.57 | Kilogram |
6 Days Left