Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4251148 |
|---|---|
| Organisation Name | Directorate Of Local Bodies |
| Tender Brief | Mohalla Ambedkarnagar Me Dr Bhim Rao Ambedkar Park Ke Prangad Me Interlocking Ka Nirman Karya. |
| Last Date For Submission | 1st Jun, 2026 |
| Opening Date | 02 Jun, 2026 |
| Document Cost | 487.00 |
|---|---|
| EMD | 41268.00 |
| Estimated Cost | 412675.00 |
| City | Ambedkar Nagar |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Excavatiopn in foundation in ordinary soil ( Loam clay, or sand ) including filling lift upto 1.5 metre (5fts.) and lead upto 30 m.(100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer - in - charge upto a distance of 30 M. (100 fts.) from the foundation trenches. | 13.98 | cum |
| 2 | Providing and laying Cement concrete 1:4:8( 1 cement :4 fine sand : 8 graded brick ballast 40 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in foundation and floors. | 3.11 | cum |
| 3 | First class bricks work in 1:4 in cement and coarse sand of mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. | 6.88 | cum |
| 4 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. Deduction | 26.89 | cum |
| 5 | Providing and laying Cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone ballast 20 mm. nominal size) including supply of all materials. Labour and T&P etc. required for proper completion of the work and curing complete also including cost of formwork in foundation and floors. | 15.81 | cum |
20 Days Left