| Tender ID | 4890275 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Construction Of Pontoon Bridge On Kamakhya Temple Located At Village Panhi Gram Panchayat Manjgaon Under Gomti River/vidhan Sabha Jagdishpur And Development Block Shukulbazar, Repair, Dismantling And Work Of Motor Boat For Ferry Operation |
| Last Date For Submission | 17th Jul, 2026 |
| Opening Date | 17 Jul, 2026 |
| Document Cost | 944.00 |
|---|---|
| EMD | 200000.00 |
| Estimated Cost | 2000000.00 |
| City | Amethi |
|---|---|
| State | Uttar Pradesh |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | S/L wooden anchor of size 2.4x1.8x3.1m.with 10 & 15cm. eucalyptus balli including cost of ballies, nails, all labour and T&P etc. required for proper completion of work as per direction of E/I.(For U/S) but excluiding cost of P.P. rope. | 20 | Nos. |
| 2 | S/L wooden anchor of size 2.4x1.8x3.1m.with 10 & 15cm. eucalyptus balli including cost of ballies, nails & weaving packing average 90 sand filled cement bag and also incluiding anchoring with coir rope (1.5 inch dia.) all labour and T&P etc. required for proper completion of work as per direction of E/I.(For D/S) | 10 | Nos. |
| 3 | S/o sand filled cement bags of good quality & good condition duly filled with local sand and properly stitching with Calcutta sutli for filling in anchor, bandling etc. work including cost of all material, labour, carriage, T&P etc. and placing as per direction of E/I. | 500 | Nos. |
| 4 | Errection/construction of Pile culvert including cost of Balli,mallahi nail, carriage of decking material & including piling after making shoes complete. | 90.00 | sqm |
| 5 | Dragging the pontoon from dry bed on the river bank to river water pulling and rolling them in the water to bring in the proper position and making pairs of two pontoons with girder and anchoring them in D/s of pontoon bridge including all labour,T&P etc.required for proper completion of the work as per direction of E/I | 8 | Pair |