Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4443742 |
|---|---|
| Organisation Name | Department Of Agriculture |
| Tender Brief | Construction Shed Cleaning And Grading, Besan Plant And Dall Mill Unit 139 Sq.mt |
| Last Date For Submission | 8th Jun, 2026 |
| Opening Date | 09 Jun, 2026 |
| Document Cost | 590.00 |
|---|---|
| EMD | 0.00 |
| Estimated Cost | 2464000.00 |
| City | Amravati |
|---|---|
| State | Maharashtra |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | CONSTRUCTION OF CLEANING GRADING & BESAN MILL SHED 139 sq.mt | ||
| 2 | ITEM NO. : 1 Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 0.00 to 1.50 m.) m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) | 33.750 | Cu.Mt. |
| 3 | ITEM NO. : 2 Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Manual Means. | 1.000 | Cu.Mt. |
| 4 | ITEM NO. : 3 Filling in plinth and floors with contractors material/brought from outside and approved by Engineer incharge in layers of 15 cm to 20 cm including watering and compaction etc. complete. | 78.690 | Cu.Mt. |
| 5 | Providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with Crushed sand/grit, ramming, atering etc. complete. i)Breeder Parent Poultry Shed ii)Compost Pit For Mortality Disposal iii)Grower Chicks Poultry Shed iv)Hatchary Unit v)Poultry Feed Processing Unit | 1.000 | Cu.Mt. |
8 Days Left