Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4612981 |
|---|---|
| Organisation Name | Military Engineer Services |
| Tender Brief | Corrigendum : Repair Replacement Of Plytop From Charpoy Gi Pipe Plytop Under Ge Amritsar |
| Last Date For Submission | 13th Jul, 2026 |
| Opening Date | 20 Jul, 2026 |
| Document Cost | 500.00 |
|---|---|
| EMD | 70000.00 |
| Estimated Cost | 3500000.00 |
| City | Amritsar |
|---|---|
| State | Punjab |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Charpoy GI pipe (FD-220) Material and labour for removing old unserviceable plywood top from charpoy GI pipe (FD-220) and supply and fixing new 12 mm BWR phenol bonded commercial plywood of size 2000 mm x 900 mm including providing 50mm wide strip made out of 6mm thick plywood for filling gap between plywood sheet and short rails including replacement of bolts and nuts etc. for fixing of plywood complete all as specified and as directed. Make of plywood - KITPLY, GREENPLY, ARCHIDPLY, CENTURYPLY. | 1750 | Each |
| 2 | Material and labour for removing of old unserviceable GI check nut of 32mm dia and supply and fixing of GI check nut of 32mm ISI marked in position and tightening of necessary components of charpoy complete all as specified and directed. | 200 | Each |
| 3 | Material and labour for removal of old broken threaded long rail from charpoy GI and supply & fixing of new long rail made of GI tubing 32mm bore medium grade (ISI marked) both ends threaded complete all as specified and directed. Make : TATA, JINDAL, OSWAL | 300 | Each |
| 4 | Material and labour for removal of old broken threaded short rail and fixing short rail made from old long rail obtained from item No 3 above duly threaded both ends complete all as specified and directed. | 200 | Each |
| 5 | Material and labour for removal of old broken threaded leg from charpoy GI and fixing of leg made from old short rail obtained from item No 4 above including provision of cap welded on bottom and two Nos of clamps each welded duly threaded one end complete all as specified and directed. | 200 | Each |
6 Days Left