Complete Tender Details

Empowering Indian businesses in the procurement ecosystem since 2012

Tendering Authority: Public Works Department
Tender ID4536543
Organisation NamePublic Works Department
Tender BriefCorrigendum : Construction/ Upgradation Of Interior Roads Of Hiller Including Hiller Tengpawa Link
Last Date For Submission6th Jul, 2026
Opening Date07 Jul, 2026
Cost
Document Cost5500.00
EMD954100.00
Estimated Cost47705300.00
Location
CityAnanthnag
StateJammu and Kashmir

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in cutting Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil840.000Cum
2RBM Supply and filling of RBM ,including spreading, watering, ramming and compacting with road roller of 8-10 tonne capacity including all carriage of same from approved source upto site of work, complete job3712.500Cum
3GSB Providing and laying GSB having P.I not more than 6, Incl Spreading in layers not exceeding 150mm compacted thickness and consoludated by 8-10 Ton poer road roller at OMC to achive at least 908% of Max. dry density as per IS 2720 to the required and grade as per specifications with CBR value not less than 20 inl. all lead and carriage complete2750.000Cum
4WBM II Providing & Laying water bound macadam with specified stone aggregate stone screening and binding material including screening, sorting, spreading to template and consolidation with power road roller of 8 to 10 tonne capacity etc. complete including cost stone aggregate, screenings, kankar, moorum and red bajri etc. complete job Base course with 63 mm to 45 mm size including stone screenings 13.2 mm size including carriage complete900.000Cum
5WET MIX MAACADAM Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge1500.000Cum
6th Jul, 2026

5 Days Left

WhatsApp