Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4853021 |
|---|---|
| Organisation Name | Public Works Department |
| Tender Brief | Comprehensive Maintenance Contract With Operation Of 1000 Lpm Capacity (02 Nos) Oxygen Generation Plants (inmatec Make) Including All The Associated Electrical Equipments For One (01) Year At District Hospital Shopian. |
| Last Date For Submission | 14th Jul, 2026 |
| Opening Date | 15 Jul, 2026 |
| Document Cost | 1000.00 |
|---|---|
| EMD | 64160.00 |
| Estimated Cost | 3208000.00 |
| City | Anantnag |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Comprehensive Annual Maintenance Contract of Oxygen Generation Plants of 1000 LPM Capacity (02 Nos.) (Make INMATEC) for One (01) Year at District Hospital, Shopian as per annexure C of NIT | 1.00 | Job |
| 2 | Operation of Oxygen Generation Plants of 1000 LPM Capacity (02 Nos.) (Make INMATEC) for One (01)Year at District Hospital, Shopian as per annexure C of NIT (06 persons per month @ 2 persons per shift for 12 months) | 12.00 | Months |
| 3 | Comprehensive Maintenance Contract of 320 KVA D.G. Set (02 Nos.) at 1000 LPM Oxygen Generation Plants (Make INMATEC) for One (01) Year at District Hospital, Shopian as per annexure C of NIT | 1.00 | Job |
| 4 | Comprehensive Maintenance Contract of 320 KVA (02 Nos.) AMF Panels, LT Panels, Bus Bar Panels including Servo Stabilizers and various armored Cables at 1000 LPM Oxygen Generation Plants (Make INMATEC) for One (01)Yearat District Hospital, Shopian as per annexure C of NIT | 1.00 | Job |
| 5 | Complete Rewinding of 90 kW, 400V, 50Hz, 2975RPM, 3-Phase Induction Motor (FS Curtis Make) and Replacement of bearings set. The job includes decoupling and removal of the motor, removing the rotor from the stator and carrying out complete disassembly. The burnt/damaged winding shall be removed and the stator slots thoroughly cleaned and then rewinding the motor. Rewinding shall be carried out using high-quality copper winding wire with proper insulation, coil formation, and connections as per standard. The stator shall be varnished for proper insulation strength. The existing defective bearings comprising one set of Pulley End (PE) Bearing No. 6317/C3 and Opposite Pulley End (OPE) Bearing No. 6314/C3 shall be carefully removed using suitable tools and tackles, and replaced with new bearings of FAG or equivalent imported make, complete with proper greasing and ensuring correct fitment and alignment. The job further includes refitting of rotor into stator after rewinding and bearing replacement with due care to avoid damage to windings and components, complete reassembly of the motor, alignment, reinstallation and checking for smooth, vibration-free and satisfactory operation. The removed burnt copper winding/scrap material shall be taken by the contractor and its value is included in the quoted rate. All materials, copper winding wire, insulation materials, varnish, bearings, consumables, skilled labour, tools & tackles, handling/loading- unloading charges, transportation and all incidental works required for satisfactory completion of the job are included in this job. | 1.00 | Job |
7 Days Left