Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4073856 |
|---|---|
| Organisation Name | Pradhan Mantri Gram Sadak Yojana |
| Tender Brief | L037nh1a Km 242 To Monward Package No. Jk01412 |
| Last Date For Submission | 28th Apr, 2026 |
| Opening Date | 28 Apr, 2026 |
| Document Cost | 300.00 |
|---|---|
| EMD | 1200.00 |
| Estimated Cost | 62000.00 |
| City | Anantnag |
|---|---|
| State | Jammu and Kashmir |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Pipe Crossing 600 mm Dia | ||
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :(Complete Job Finished work to be measured) | 17.94 | Cum |
| 3 | Type B (First Class) Bedding: Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii)Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job (Finished work to be measured). | 1.38 | Cum |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:M-10 1:3:6(1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job (Finished work to be measured). | 1.38 | Cum |
| 5 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete.600 mm dia. R.C.C. pipe Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job (Finished work to be measured). | 11.50 | Rm |
4 Days Left