Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4034506 |
|---|---|
| Organisation Name | Indian Institute Of Management |
| Tender Brief | Painting Works At Mdc Block At New Iimb Campus |
| Last Date For Submission | 11th May, 2026 |
| Opening Date | 12 May, 2026 |
| Document Cost | 0.00 |
|---|---|
| EMD | 62000.00 |
| Estimated Cost | 2027600.00 |
| City | Anekal |
|---|---|
| State | Karnataka |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. | 2500.000 | Sq,m |
| 2 | Wall painting with premium acrylic emulsion paint, having VOC (Volatile Organic Compound) content less than 50 g/L, of approved brand and manufacture, including applying additional coats wherever required, to achieve even shade and colour. One coat as per specifications and as per directions of Engineer in charge | 9600.000 | Sq,m |
| 3 | Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge | 5000.000 | Sq,m |
| 4 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :One coats on old work as per specifications and as per directions of Engineer in charge. | 2500.000 | Sq,m |
| 5 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on network over an under coat of suitable shade with ordinary paint of approve brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. | 2000.000 | Sq,m |
23 Days Left