Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4853716 |
|---|---|
| Organisation Name | Local Self Government Department |
| Tender Brief | Annual Plan-angamaly Muncipality 2026- 2027- T B Nagar 2nd Street Retarring Tile Paving K N Nagar 6th Bye Lane Retarring In Ward 5 (pro.no.41/26-27)-amc-general Civil Work |
| Last Date For Submission | 15th Jul, 2026 |
| Opening Date | 17 Jul, 2026 |
| Document Cost | 1495.00 |
|---|---|
| EMD | 16948.00 |
| Estimated Cost | 677931.00 |
| City | Angamaly |
|---|---|
| State | Kerala |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Retarring & Interlock | ||
| 2 | 3.2:Preparation of Foundation for Embankment <br> Scarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical Means <br> Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. | 227.200 | sqm |
| 3 | 4.1.A.1:Granular Sub-base with Well Graded Material (Table 400.1) <br> (A) By Mix in Place Method <br> Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. <br> (i) For Grading I Material | 22.720 | cum |
| 4 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 26.070 | sqm |
| 5 | 75.5.2.1pb:Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 660.000 | sqm |
8 Days Left