Tender ID4271824
Organisation NameWorks Department
Tender BriefConstruction Of Godown With Watch Tower For Infrastructure Work At Krishi Vigyan Kendra, Angul For The Year 2025-26 Under Dmf (civil, Ei, Ph)
Last Date For Submission28th May, 2026
Opening Date29 May, 2026
Cost
Document Cost6000.00
EMD20500.00
Estimated Cost2049442.00
Location
CityAngul
StateOdisha

Register to see full details

BOQ Items
#ItemQtyUnits
1Part-A (Civil Work) Earth work in excavation in foundation trenches, column foundation, pit, etc in all kind of soil including moorum stony earth and earth mixed with boulders except sheet rock and boulders not requiring blasting including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site with initial lead of 50 mtr and all lifts, including shoring, shuttering & dewatering (if required) with cost of labour, labour cess, hire & running charges of all machineries, sundries & T&P required for the work complete as directed by the Engineer in charge.45.440Cum
2Providing and laying Plain Cement Concrete of proportion (1:3:6) using 40 mm size grade black hard crusher broken granite stone metal, washed and screened sharp sand of approved quality from approved quarry including hoisting, lowering, laying the concrete, ramming, watering and curing etc. complete to required thickness including cost of all materials, conveyance, loading, unloading, royalties, cost of labours, T&P, hire & running charges of concrete mixer, etc. all complete as per the direction of the Engineer -in -charge. 11.170Cum
3RCC M20 having compressive strength of 20mpa, target mean strength of 30mpa, for150mm cubes at 28 days curing as per IS-456-2000 & I.R.C-212000 test conducted in accordance with I.S. 516 using 20mm & down graded size crusher broken hard granite coarse aggregate of approved quality and from approved quarry & other materials as per section 302 of I.R.C.21-2000 & IS-456-2000 of approved quality including centering, shuttering & form works for providing smooth & water tight surface, hoisting, lowering & laying concrete in layers not exceeding 30 cm. compacted thickness, compacting with mechanical vibrators true to lines, grades as per drawing & technical specifications, watering & curing for 28 days including basic cost, conveyance, royalties of all materials with all leads & lift, cost of all labour T&P, including labour cess but excluding GST & equipment required for mixing, transporting & placing in position vibrating, compacting, finishing & curing including all incidental expenses complete in all respect as per direction of the E.I.C. but excluding the cost of M.S. rods or Tor steel and binding wire & labour charges for bending binding & tying the grills Column footing6.380Cum
4Tie Beam2.360Cum
5Roof Beam5.770Cum