Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 5017242 |
|---|---|
| Organisation Name | Forest Environment And Climate Change Department |
| Tender Brief | Construction Of Masonary Parapet Wall Along U/s Of Rengali Reservoir And Development Of Jetty Area For Tourism Near Rengali Dam Under Kaniha Range Of Angul Forest Division |
| Last Date For Submission | 29th Jul, 2026 |
| Opening Date | 30 Jul, 2026 |
| Document Cost | 6000.00 |
|---|---|
| EMD | 36350.00 |
| Estimated Cost | 3635000.00 |
| City | Angul |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Clearing & grubbing road land including uprooting rank vegetation,grass, bushes,shrubs,sapling & trees girth up to 300mm,removal of stumps of trees cut earlier & disposal of unserviceable materials & stacking of servicible material to be used or uctioned up to a lead of 1000 m including removal & disposal of top organic soil not exceeding 150m in thicknes as per approved specification and direction of the Engineer -in- Charge. | 1350.00 | Sqm |
| 2 | Excavation of Foundation in hard soil, Levelling foundation trench etc complete including cost of labour, Labourcess,T&P materials etc.complete and as per the direction of the Engineer-in-charge. | 155.70 | Cum |
| 3 | Excavation of Foundation in hard rock( Granite) removed by chiselling including dressing & Levelling the bed not exceeding 1.5m in depth & depositing the soil with initial lead & lift etc complete including cost of labour, Labourcess,T&P materials etc.complete and as per the direction of the Engineer-in-charge. | 8.10 | Cum |
| 4 | Filling foundation and plinth with clean course sand, well watered and rammed with cost, conveyance, royalty and taxes of all materials and cost of all labour, T&P, workers welfare cess etc. complete as per approved specification and direction of the Engineer -in- Charge. | 43.09 | Cum |
| 5 | Cement Concrete (1:3:6 ) using 40 mm size hard black granite crusher broken metals with cost conveyance, taxes of all materials and labour etc. complete as per direction of Engineer-in-charge | 183.67 | Cum |
8 Days Left