Empowering Indian businesses in the procurement ecosystem since 2012
| Tender ID | 4269607 |
|---|---|
| Organisation Name | Works Department |
| Tender Brief | Construction Of Revenue Ib At Pallahara (civil, Ei, Ph) |
| Last Date For Submission | 28th May, 2026 |
| Opening Date | 29 May, 2026 |
| Document Cost | 10000.00 |
|---|---|
| EMD | 74900.00 |
| Estimated Cost | 7482921.00 |
| City | Angul |
|---|---|
| State | Odisha |
| # | Item | Qty | Units |
|---|---|---|---|
| 1 | Part -A (Civil works) Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness including cost of all labours, T & P, sundries etc. as required for the work complete as per the direction of the Engineer-in-charge. | 360.000 | Sqm |
| 2 | Earth work in excavation in foundation trenches, column foundation, pit, etc in all kind of soil including moorum stony earth and earth mixed with boulders except sheet rock and boulders not requiring blasting including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site with initial lead of 50 mtr and all lifts, including shoring, shuttering & dewatering (if required) with cost of labour, labour cess, hire & running charges of all machineries, sundries & T&P required for the work complete as directed by the Engineer in charge. Upto 1.5 Mtr Depth | 143.900 | Cum |
| 3 | From 1.5 Mtr upto 3.0 Mtr Depth | 35.400 | Cum |
| 4 | Supplying and stacking of good earth at site obtained from approved borrow pits including including carriage by mechanical means from within a specified Lead from from the site, including loading, unloading to approved dumping ground or as approved /directed by Engineer-in-charge, including cost of equipments/ labour, conveyance, royalty, T&P etc. as per the direction of Engineer-in-charge. ((earth measured in stacks will be reduced by 20% for payment). | 30.000 | Cum |
| 5 | Disposal of building rubbish / malba /rock/ similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved dumping ground or as approved /directed by Engineer-in-charge, including all lifts involved.etc as per the direction of Engineer-in-charge. | 179.260 | Cum |
Closed