Tender ID4462809
Organisation NameWater Resources Department
Tender BriefConstruction Of Kantal- 2 In-stream Storage Structure (low Height Check Dam) Over Kantal Nalla Near Village Kantal In Atabira Block Of Bargarh District Under Maty-3 Scheme For The Year 2026-27
Last Date For Submission16th Jun, 2026
Opening Date17 Jun, 2026
Cost
Document Cost10000.00
EMD71100.00
Estimated Cost7102811.00
Location
CityATTABIRA
StateOdisha

Register to see full details

BOQ Items
#ItemQtyUnits
1Earth work in foundation in hard soil or gravel soil in embankment, roads etc.within 50m initial lead and one extra lift over 1.5m initial lift including rough dressing and beaking clods to mamimum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge.2890.40One Cum
2Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014 cum in volume within 50 m initial lead and 1.5 m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per specification approved by the department.89.78One Cum
3Cutting in D.I rock not requiring blasting to be removed by pick axes and crow bars and depositing materials within 50m initial lead and 1.5m initial lift including rough dressing as per direction and specification of the department including stacking the useful materials separately as ordered.59.85One Cum
4Fixing 25mm dia anchor bars in foundation rock including drillind 35mm dia holes.Fixing wedged anchor and grouting with cement mortar 1: 4 complete as per direction of Engineer in Charge inccluding cost of M.S.rods for dams,barrages and power house structure including pull testing of 30% of anchors.( Depth of holes only to be measured for payment purpose)12.00One Meter
5Cement concrete M15 grade with crushed granite coarse aggregate of 20 mm down graded mixed in concrete mixture including cost of all materials ,machineries and labouer with all lead for materials upto the mixing yard and transportation of mixed concrete within initial lead of 50m and laying in dams, barrages,power house and pen stock with all lift/delift upto 1.50m height above average ground level etc. complete in all respect to proper slope & level with all cost, conveyance, royalty & other taes of all materials complete in all respect as directed by the Engineer-in-charge.709.12One Cum